Herrenschwanden New school building
Short description
School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)
Challenges
Ensuring safety for the school and kindergarten users during ongoing operations.
Construction of service lines in the Halegasse area due to limited space and to ensure access to Höheweg.
Hybrid construction method with regard to dimensional tolerances and building physics (especially sound and acoustics).
Sustainability
The school building was built according to the Minergie standard, but not certified.
Heat is generated (heating and domestic hot water) by means of a brine heat pump.
The PV system on the roof is designed so that the surplus electricity is fed into the grid.
Only native plants were used for the surroundings.