Essen municipal utilities – pipe construction
Short description
Replacement of a mixed water pipe DN 800 to DN 1,000 – wastewater dewatering during construction.
The project
- Replacement of a mixed water pipe DN 800 to DN 1,000
- Length 280 m at depths of 3.5 to 5.0 m
- 10 special construction elements with individual weights from 16 to 40 t
- Earthworks in class 6 and 7 ground including groundwater dewatering
- Wastewater dewatering during construction
- Extensive traffic safeguarding measures