|

How to build for future mobility?

Implenia is building Sweden's longest tram bridge between Stockholm and the suburb of Lidingö. It runs 750 meters over an sea inlet and connects the island with the city center. The bridge is being built using industrially prefabricated formwork elements. They are assembled using a specially developed steel assembly truck. This construction method saves time and guarantees consistently high quality.

Interested in complex civil engineering projects from a single source?

More on this topic