Freiburg / Fribourg, Implenia Switzerland Ltd.
In Fribourg, our customers can draw on Implenia's entire portfolio of services. Our specialists work across locations and divisions to offer you the best solution from a single source.
Services offered
Contact
References
Rocket & Tigerli
Winterthur, Switzerland
Start of construction: September 2025
At 100 meters, "Rocket" in Winterthur is one of the tallest timber residential buildings currently in planning. The building complex comprises attractive rental apartments and hotel rooms. The three "Tigerli" buildings complete…
The Flag
Massagno (Lugano), Switzerland
Start of construction:
December 2022
Construction volume (value of our services):
18,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Two buildings with 78 barrier-free apartments are being built in Lugano, which not only offer the highest level of living comfort, but also a wide range of services for a self-determined life in old age.
Laborneubau Departement Biomedizin DBM Universität Basel
Basel, Switzerland
Start of construction:
October 2022
Construction volume (value of our services):
259 M EUR
Costs converted according to average yearly exchange rates during project realization
The Department of Biomedicine (DBM) of the University of Basel combines the experimental laboratory research of the medical faculty in the latest new building of the Life Sciences Campus on the Schällemätteli site in Basel. This…
Luzerner Kantonsspital – Neubau Kinderspital/Frauenklinik
Luzern, Switzerland
Start of construction:
August 2022
Construction volume (value of our services):
41,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The new building will enable future-oriented further development of pediatric medicine (pediatrics and pediatric surgery) as well as obstetrics and gynecology at the highest level and is an important step for future health care…
Angéloz, Fribourg
Fribourg, Switzerland
Start of construction: July 2022
The project concerns an existing building in the city centre of Fribourg, Rue de Romont 33, in which the owner wanted to carry out an interior extension and a conversion of the administrative and sanitary rooms.
COE Green Village, Bâtiment Kyoto
Le Grand-Saconnex, Switzerland
Start of construction:
June 2022
Construction volume (value of our services):
61,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of an administrative building in the new Green Village district on the site of the Ecumenical Center of Churches.
Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude
Liestal, Switzerland
Start of construction:
February 2022
Construction volume (value of our services):
40,9 M EUR
Costs converted according to average yearly exchange rates during project realization
In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …
Green Village Route de Ferney
Genf, Switzerland
Start of construction:
September 2021
Construction volume (value of our services):
389.000 EUR
Costs converted according to average yearly exchange rates during project realization
The building is named after the Montreal Protocol, an international agreement signed by 24 countries in 1987 to reduce by half the number of substances that damage the ozone layer. In 2009, it became the first universally…
Laborprovisorium Functional Genomics Center Zürich
Zürich, Switzerland
Start of construction:
July 2021
Construction volume (value of our services):
16,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…
Lokstadt Elefant
Winterthur, Switzerland
Start of construction:
April 2021
Construction volume (value of our services):
42,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The "Elefant" is a modern office building consisting of a historic part of the building and a new 7-storey timber construction. This makes it one of the largest timber office buildings that Implenia has developed and realized for…
Masterplan Forschungscampus Empa Eawag, Etappe 1
Düebendorf, Switzerland
Start of construction: April 2021
In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…
MFH Lilienstrasse
Allschwil, Switzerland
Start of construction:
July 2020
Construction volume (value of our services):
6,5 M EUR
Costs converted according to average yearly exchange rates during project realization
The "Lilienstrasse" project consists of a four-storey building and a car park.
Mission Permanente de l’Inde
Pregny-Chambésy, Switzerland
Start of construction: June 2020
India passed the 1.4 billion mark last year, making it the most populous country in the world. The diplomatic mission in French-speaking Switzerland could therefore no longer make do with the cramped premises in the centre of…
Les Jardins de Rozon
La Croix-de-Rozon, Switzerland
Start of construction: June 2020
Marking the border with France, Bardonnex is home to a number of residential communities, including La Croix-de-Rozon.
Sézenove
Bernex, Switzerland
Start of construction: June 2020
Close to the hamlet of Sézenove, to the south-west of the commune of Bernex, lies a village-style residential area.
Worblaufen Hammerwerk residential development
Worblaufen, Switzerland
Start of construction:
May 2020
Construction volume (value of our services):
29,9 M EUR
Costs converted according to average yearly exchange rates during project realization
New residential development on the banks of the River Aare on the former Hammerwerke site in the municipality of Ittigen / Worblaufen (BE).
Swiss Life Brannhof
Zürich, Switzerland
Start of construction:
March 2020
Construction volume (value of our services):
97,1 M EUR
Costs converted according to average yearly exchange rates during project realization
With the redevelopment of Swiss Life Brannhof in Zurich's Bahnhofstrasse comes a new and attractive mixed-use concept. Thus, the historic pioneering spirit on the renowned promenade and shopping street will be given a new lease…
Innere Erneuerung, Hummelbergstrasse 8 - 16
Rapperswil-Jona, Switzerland
Start of construction:
February 2020
Construction volume (value of our services):
4,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The existing properties are located in an attractive residential area in Rapperswil-Jona and were renovated a few years ago. Although the occupancy rate remains very good, the owner has been intending to carry out a renovation…
Am Giessenplatz M1.2.1
Dübendorf, Switzerland
Start of construction:
February 2020
Construction volume (value of our services):
20,5 M EUR
Costs converted according to average yearly exchange rates during project realization
A new, attractive residential quarter is being built on the banks of the Glatt in Dübendorf. Once all four stages have been completed, the quarter will have a total of around 385 flats, 60 care rooms and a new city park. …
Résidence Honolulu, Etoy VD
Etoy, Switzerland
Start of construction: January 2020
The Résidence Honolulu, a new address with all the comforts in Etoy, for senior citizens and people with reduced mobility who are looking for conviviality and security.
New Aarau Cantonal Hospital "Dreiklang" (KSA) building
Aarau, Switzerland
Start of construction: January 2020
The cantonal hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…
Primary school building Martin Haffter
Weinfelden, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
24 M EUR
Costs converted according to average yearly exchange rates during project realization
The Martin Haffter primary school building was constructed using timber elements. The new building is Minergie-certified.
Vier Wohnhäuser Langenhagweg
Allschwil, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
19,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The Langenhagweg project consists of 4 residential buildings, each with a basement and base floor, a ground floor, two upper floors and an attic floor.
Rue de Lausanne 42-44, Genève
Genève, Switzerland
Start of construction: June 2019
The building at rue de Lausanne 42-44 in Geneva, built in 1962, is located in a sought-after urban district in the heart of the right bank, within easy reach of Cornavin station, transport links, business and shopping facilities…
Adret 15-17-19, Lancy
Grand-Lancy, Switzerland
Start of construction: June 2019
The project is located in the new district created to the west of the CEVA railway line, at the Lancy-Pont-Rouge station of the Léman express. It is part of a complex of 635 public housing units in various categories (low-income,…
Herrenschwanden New school building
Herrenschwanden, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
7,6 M EUR
Costs converted according to average yearly exchange rates during project realization
School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)
KIM residential and commercial development / construction site 4.1
Winterthur, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
77 M EUR
Costs converted according to average yearly exchange rates during project realization
The One Company project 'KIM' is being built in Winterthur Neuhegi near Neuhegi railway station. A total of 208 rental flats are being built with public-oriented uses on the ground floor.
Giessenturm
Dübendorf, Switzerland
Start of construction:
January 2019
Construction volume (value of our services):
82,5 M EUR
Costs converted according to average yearly exchange rates during project realization
In the northwest of Dübendorf, between the Überlandstrasse and the idyllic riverside path of the Glatt, a new urban district is being built on the former Givaudan site in five stages by 2022.
Quartier de l'Etang - Îlot E
Vernier, Switzerland
Start of construction: December 2018
The Quartier de l'Etang, an exemplary conversion of an industrial site two kilometers from the historic center of Geneva, has become a strategic urban piece. Located in the commune of Vernier, it extends over a 9.5 hectare…
New BSS building of the Department of Biosystems, Basel
Basel, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
145 M EUR
Costs converted according to average yearly exchange rates during project realization
The new building for the Department D-BSSE (Department of Biosystems Science and Engineering), founded by ETH Zurich in 2007, will provide experimental biologists and bioinformaticians with the best conditions to generate new…
Wohnhochhaus Baslerstrasse
Zürich, Switzerland
Start of construction:
September 2018
Construction volume (value of our services):
58,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The high-rise building with its plinth blends in perfectly with Zurich's up-and-coming outer district and sets a striking urban accent.
Deisswil b. Stettlen Bernapark
Bernapark, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
61,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.
Neubau Halle 7, Militärflugplatz ZLE
Emmen, Switzerland
Start of construction:
July 2018
Construction volume (value of our services):
26,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Hangar building with a total of 7 aircraft boxes in solid construction 187mx27m. On the north side is a three-story annex for offices.
ONU, Palais des nations Bâtiment H
Genève, Switzerland
Start of construction: June 2018
Construction of a new administrative building within the Palais des Nations.
Petite Prairie 2, Nyon
Nyon, Switzerland
Start of construction: June 2018
The Petite Prairie district in the heights of Nyon is made up of several urban components. Petite Prairie 2 is the second stage of this major project to extend the town to the north-west, and was the result of a competition won…
Cilag Microbio Lab B45
Schaffhausen, Switzerland
Start of construction:
June 2018
Construction volume (value of our services):
12,4 M EUR
Costs converted according to average yearly exchange rates during project realization
New building Microbio laboratory with technical rooms in Schaffhausen
Kornhaus
Romanshorn, Switzerland
Start of construction:
May 2018
Construction volume (value of our services):
25,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project involved the conversion and extension of the former SBB warehouses with an underground car park in Romanshorn.
Leonardo – Thurgauerstrasse 80
Zürich, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,5 M EUR
Costs converted according to average yearly exchange rates during project realization
The "Leonardo" office building, which went into operation in 2002, was the largest office building in Switzerland to be built to the Minergie standard at the time.
Schmitten Residential development Bodenmattpark
Schmitten, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,6 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential development in the village centre of Schmitten (FR). The 70 flats of owner-occupied standard are divided into 5 buildings, each with 5 storeys. The surroundings would be designed according to the…
New residential and commercial development in the picture
Zizers, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Commercial: Coop Cooperative with 650 m2 of retail space 33 rental apartments between 2 ½ and 5 ½-rooms.
Grubenstrasse 23 / 25
Langenthal, Switzerland
Start of construction:
January 2018
Construction volume (value of our services):
1,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Prior to the actual building works, Implenia Real Estate Consulting carried out a property analysis to investigate the development potential of the property. After completion of the analysis, a renovation concept was developed…
Neubau Leister AG
Kägiswil, Switzerland
Start of construction:
January 2018
Construction volume (value of our services):
17,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Addition of a new production to the existing building.
Renovation of the Weyergut Centre, Mohnstrasse 4
Köniz, Switzerland
Start of construction: January 2018
The "Weyergut" retirement and nursing home in Wabern, which originally served as a retirement home and is currently used as a nursing home with its own dementia unit, is in need of renovation after 40 years of intensive use. …
Rolle, Rue du Temple 8
Rolle, Switzerland
Start of construction: January 2018
The project in Rolle, which was realised by the total contractor Implenia from 2018 to 2022, was the starting point for a more comprehensive urban redevelopment that also included Rue du Temple and the new Place du Marché, which…
Vogelsang Wetzikon – Mönchberg- /Preyen- /Tösstalstrasse
Wetzikon, Switzerland
Start of construction:
October 2017
Construction volume (value of our services):
55,8 M EUR
Costs converted according to average yearly exchange rates during project realization
The modernisation of the area comprises three stages with 12 existing residential buildings. The majority of the properties are Göhner buildings which are being enlarged to meet contemporary living requirements, including the…
WÜB Bernhardswies, Bernhardswiesstr. 28-34, Hechtackerstr. 12-12g, 14-14b
St. Gallen, Switzerland
Start of construction:
August 2017
Construction volume (value of our services):
36,5 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of four apartment buildings with 147 rental apartments and commercial premises as well as a kindergarten.
OMS, Bâtiment B
Genève, Switzerland
Start of construction: June 2017
Construction of a new administration building on the campus of the World Health Organisation. Demolition and remediation of contaminated sites in advance.
Edmond Vaucher 19-19c
Châtelaine, Switzerland
Start of construction: June 2017
Avenue Edmond-Vaucher connects Avenue de Châtelaine and the intersection of Le Bouchet and runs through a patchy landscape. A new, modern residential building with 60 flats and a large shop is being built on the site. The…
Atrium Park
Meyrin, Switzerland
Start of construction: June 2017
The municipality of Meyrin, which occupies a strategically important location, is home to major industrial areas and numerous urban development projects, including the multifunctional CP de la Bergère - Atrium Park property…
Espace Tourbillon
Plan-les-Ouates, Switzerland
Start of construction: June 2017
Strategically located at the crossroads of major transport routes to French-speaking Switzerland, France and Italy, Espace Tourbillon in the Plan-les-Ouates industrial zone is a new public attraction.
Interior renovation Postmatte 1/3/5 and Zellburg 2/3/4
Schenkon, Switzerland
Start of construction:
March 2017
Construction volume (value of our services):
5,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The scope of the renovation of these six residential buildings with a total of 68 flats comprised the bathroom units, kitchens, lift systems and parts of the external works. In addition, contaminants were removed from the areas…
Neubau Verwaltungszentrum Sinergia
Chur, Switzerland
Start of construction:
March 2017
Construction volume (value of our services):
58,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Cantonal administration building with open space office structure. Consolidation of 14 offices.
Pressy 17
Vandœuvres, Switzerland
Start of construction: March 2017
In a neighborhood of beautiful residences in the commune of Vandoeuvres, on a 15,928 square meter plot, a complex of four volumes has replaced the 1960s villa. In the heart of this haven of peace bordering the Geneva Golf Club,…
Edmond Vaucher
Châtelaine, Switzerland
Start of construction: February 2017
oie perpendicular to the avenue de Châtelaine and the carrefour du Bouchet, the avenue Edmond-Vaucher traces a long straight line in a disparate landscape where the allotment gardens and the public park impose their green lung…
«RIVUS» WÜB Rehetobelstrasse 64 / 66
St. Gallen, Switzerland
Start of construction:
February 2017
Construction volume (value of our services):
18,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of two apartment buildings with 55 apartments and conversion of the old workshop.
Bassbelt residential complex
Pieterlen, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
20,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…
Les Terrasses Volantes
Saint-Blaise, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
16,9 M EUR
Costs converted according to average yearly exchange rates during project realization
Nestled between vineyards, water and sky, Terrasses Volantes enjoys a privileged location in the communes of Hauterive and Saint-Blaise. Taking advantage of the sloping terrain to enhance the exceptional panorama, the project has…
Haus Adeline Favre (Hall 52)
Winterthur, Switzerland
Start of construction:
December 2016
Construction volume (value of our services):
62,3 M EUR
Costs converted according to average yearly exchange rates during project realization
In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new…
Îlot Vert
La Chaux-de-Fonds, Switzerland
Start of construction:
November 2016
Construction volume (value of our services):
37,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Îlot Vert is a multifunctional building in La Chaux-de-Fonds. The building offers a new, contemporary image to a complex that has been disused for several years. The project is located in the checkerboard zone, just above…
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction:
October 2016
Construction volume (value of our services):
39,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of new swimming pool and sports hall on Sursee campus
Retirement living Silber
Schaffhausen, Switzerland
Start of construction:
September 2016
Construction volume (value of our services):
102 M EUR
Costs converted according to average yearly exchange rates during project realization
In Schaffhausen, a retirement housing project was built to the Minergie standard.
Düdingenplus, Étapes 2 et 4
Düdingen, Switzerland
Start of construction: July 2016
The Düdingenplus project was initially developed jointly by Implenia Suisse SA's subsidiaries in Fribourg and Bern. It consists of eight residential buildings with commercial areas that now stand opposite Guin/Düdingen railway…
Résidence Les Hauts de Drize
Plan-les-Ouates, Switzerland
Start of construction: June 2016
Proche du Salève, à cinq minutes du centre de Carouge, dans la commune genevoise de Plan-les-Ouates, la parcelle se situe sur la Route d’Annecy, dans un cadre privilégié du fait d’une végétation abondante dans un environnement…
Promenade des Artisans, Meyrin
Meyrin, Switzerland
Start of construction: June 2016
The Promenade des Artisans project in Meyrin, originally planned for large villas, was converted into a residential building with 66 age-appropriate flats and activity zones due to the need for medical facilities. …
Security Centre
Weinfelden, Switzerland
Start of construction:
May 2016
Construction volume (value of our services):
7,1 M EUR
Costs converted according to average yearly exchange rates during project realization
New security center for Weinfelden
GIBZ Bildungszentrum Trakt 5
Zug, Switzerland
Start of construction:
April 2016
Construction volume (value of our services):
11,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Educational center with 20 classrooms, 10 group rooms and 1 seminar room.
Andreasturm
Zürich, Switzerland
Start of construction:
April 2016
Construction volume (value of our services):
89,5 M EUR
Costs converted according to average yearly exchange rates during project realization
SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…
Neubau Hallenbad Oberes Rheintal in Altstätten
Altstätten, Switzerland
Start of construction:
January 2016
Construction volume (value of our services):
17,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Demolition work with pollutant cleanup of existing HB new indoor swimming pool.
Fährenpark
St. Margrethen, Switzerland
Start of construction:
January 2016
Construction volume (value of our services):
13,6 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of four apartment buildings with 36 apartments.
Biel Residential development Jardin du Paradis
Biel, Switzerland
Start of construction:
October 2015
Construction volume (value of our services):
78,3 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.
sue & til
Winterthur, Switzerland
Start of construction:
October 2015
Construction volume (value of our services):
109 M EUR
Costs converted according to average yearly exchange rates during project realization
One of the largest timber construction projects in Switzerland - residential development with commercial space.
Neubau Alterspflegeheim Humanitas
Riehen, Switzerland
Start of construction:
September 2015
Construction volume (value of our services):
25,7 M EUR
Costs converted according to average yearly exchange rates during project realization
A new building is planned for a nursing home for the elderly with a garden in Riehen, Niederholz. The building has a basement, a ground floor and three upper floors.
Swisspor Châtel II
Châtel-Saint-Denis, Switzerland
Start of construction: July 2015
In 2010, insulation manufacturer Swisspor opened the largest production facility for insulation materials in Switzerland in Châtel-Saint-Denis. Today, the Swiss market leader for expanded polystyrene has built a second factory on…
Primary school centre «Elisabetha Hess»
Weinfelden, Switzerland
Start of construction:
July 2015
Construction volume (value of our services):
16,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The primary school center "Elisabetha Hess" is the first school center in the canton of Thurgau with Minergie-A certification.
INAD (Entreprise Générale)
Meyrin, Switzerland
Start of construction: June 2015
Due to the federal authorities' requirement to create a centre for asylum seekers and people who have been refused entry to Switzerland, Geneva Airport had to find a new location for the construction of a building in 2012, as the…
Rhône-Monnaie
Genève, Switzerland
Start of construction: June 2015
Crédit Suisse has been based at Bel-Air Square since 1906 and has expanded its activities and space over the years; a major renovation project in the 21st century optimised the working conditions and use of the buildings,…
Borné Nau, Grandson
Grandson, Switzerland
Start of construction: June 2015
Located on the shores of Lake Neuchâtel, the municipality of Grandson is experiencing steady and regular population growth and now has 3,000 inhabitants. The number of pupils is growing proportionally and an adaptation of the…
Hôtel des patients, Lausanne
Lausanne, Switzerland
Start of construction: June 2015
The desire to provide medical services while offering a hotel-like welcome has prompted the CHUV to adapt its services to inpatients. To welcome them, the Hôtel des Patients (patients' hotel) was opened in October 2016. …
PPE Rhône11, Aigle VD
Aigle, Switzerland
Start of construction: June 2015
Ateliers Jean-Jaques Gippa have moved from Rue du Rhône to the Les Artisans industrial estate in Aigle. The demolition of the old buildings made the second phase of the project, which began ten years ago, possible. PPE Rue du…
Immeuble LINK, Lausanne
Lausanne, Switzerland
Start of construction: June 2015
Vaudoise Insurance, the owner of the Link building, which is located near the Parc Mon-Repos and the train station, wanted to upgrade its building, built in 1976 by J.-P. Lavizzari, and at the same time give it a new identity. …
PPE Alezane, Vufflens-La-Ville
Vufflens-la-Ville, Switzerland
Start of construction: June 2015
Anchored in the heart of Vufflens-la-Ville, a quiet village in Grosde-Vaud just outside Lausanne, the "Alezane" residence - the proximity to a stud farm gave the project its name - comprises ten three-and-a-half to…
Quartier Boverattes-Est, Pully
Pully, Switzerland
Start of construction: June 2015
The landscape of the Lavaux region was shaped to tame the slopes, whether for working in the vineyard or for living. The municipality of Pully, the owner of the land, realised that many residents were leaving the municipality…
Neubau Wohnen im Knonau
Knonau, Switzerland
Start of construction:
March 2015
Construction volume (value of our services):
15,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Residential development with 3 MFH with 5 apartments each and 5 EFH.
Neubau Wohnheime Rathausen SSBL
Emmen, Switzerland
Start of construction:
March 2015
Construction volume (value of our services):
19,9 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction 3 dormitories with 90 resident rooms.
Trèfle Campus Santé
Le Grand-Saconnex, Switzerland
Start of construction: January 2015
Since the first quarter of the 20th century, it has been an implicit tradition for Geneva to host its international organizations on the right bank of Lake Geneva. This choice was justified in particular by the proximity of the…
Neubau Felix Platter Spital, Basel
Basel, Switzerland
Start of construction:
January 2015
Construction volume (value of our services):
201 M EUR
Costs converted according to average yearly exchange rates during project realization
A completely new building will be constructed at the current location on Burgfelderstrasse for around CHF 200 million. The current situation with the hospital built in 1967 no longer meets the structural and operational…
Lyss Portalyssa residential development
Lyss, Switzerland
Start of construction:
November 2014
Construction volume (value of our services):
47,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New residential development on a former commercial site in the immediate vicinity of Lyss railway station. The 143 flats are divided into 5 structures.
Neubau Wohnüberbauung Feldbreite Baufeld D2
Emmen, Switzerland
Start of construction:
September 2014
Construction volume (value of our services):
35,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Residential development with 151 apartments and commercial space on the ground floor, underground parking with 131 parking spaces.
Hinterkappelen Capella residential development
Hinterkappelen Wohlen, Switzerland
Start of construction:
September 2014
Construction volume (value of our services):
22,8 M EUR
Costs converted according to average yearly exchange rates during project realization
74 rental flats in Minergie standard
Schoren Hochhäuser
Basel, Switzerland
Start of construction:
July 2014
Construction volume (value of our services):
40,2 M EUR
Costs converted according to average yearly exchange rates during project realization
The construction project comprises the new construction of two high-rise buildings with 18 and 16 upper floors respectively. Both buildings have two basement floors. The existing car park was structurally repaired and adapted to…
Les Platanes, Genève
Genève, Switzerland
Start of construction: June 2014
The project on the Route de Meyrin in Geneva comprises the construction of five residential buildings with 72 flats and a police station, with construction work taking around 18 months following the demolition of the villas. …
Bâtiments administratif et commerces, La Sallaz
Lausanne, Switzerland
Start of construction: June 2014
From car junction to pedestrian square. The Place de La Sallaz in the upper part of Lausanne - one of the few horizontal areas in the city - had become the main intersection where car flows from five major roads coming from or…
Garage AMAG, Etoy
Etoy, Switzerland
Start of construction: June 2014
The large plateau that forms the shopping area of Etoy is filling up at breakneck speed. One of the most recent inaugurations is the new garage of the Swiss representative of a major German car manufacturer. It is located at the…
Residential and commercial development Witenzelg
Romanshorn, Switzerland
Start of construction:
June 2014
Construction volume (value of our services):
44 M EUR
Costs converted according to average yearly exchange rates during project realization
The Witenzelg residential and commercial development is a housing estate with 10 apartment buildings. It was realized according to the Minergie standard.
Modulis Business Park
Versoix, Switzerland
Start of construction: May 2014
Birth of a new business center 10 km from Geneva. Versoix can be reached by the "Route Suisse", by two SBB stations or by the CGN boats from the Swiss and French coastal towns. Geneva's public transport system also serves 11 bus…
Crèche Origami
Geneva, Switzerland
Start of construction: February 2014
Geneva displays its international dimension first and foremost on its right bank. Permanent missions, headquarters of organizations or large companies, this part of the city has not ceased to develop for nearly a hundred years.…
Migros Ticino
Lugano, Switzerland
Start of construction:
January 2014
Construction volume (value of our services):
22,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Conversion and renovation; facade renovation
Construction Sunnewiese
Islikon, Switzerland
Start of construction:
July 2013
Construction volume (value of our services):
23,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The Sunnewiese development is a new construction project with seven buildings.
Petite-Prairie, Nyon
Nyon, Switzerland
Start of construction: June 2013
After many years of delays, the La Petite-Prairie residential project in Nyon was launched, with Implenia taking on the coordination and construction of 150 flats and 8,000 square metres of office space.
Centror-Ritschard
Meyrin, Switzerland
Start of construction: June 2013
Centror, a subsidiary of watch manufacturer Audemars-Piguet, was too cramped at its old production site and needed to find a new location for its activities. The plot of land the company had its eye on appeared to be a good…
Crèche Origami, Genève
Genève, Switzerland
Start of construction: June 2013
Geneva shows its international dimension particularly on the right side of the lake, where permanent missions, headquarters of organisations and large companies have been located for almost a hundred years; in the 21st century,…
Gamma Visions Center, Etoy
Etoy, Switzerland
Start of construction: June 2013
Halfway between Geneva and Lausanne, the municipality of Etoy has an important area of 112 hectares. This area, Littoral Parc, was initially intended for the establishment of stores. As it is well connected to the road network,…
Ecole La Planchette, Aigle
Aigle, Switzerland
Start of construction: June 2013
On a 18,218 m2 meadow adjacent to the Collège de la Planchette and classified as a public utility zone, the municipality of Aigle wanted to build infrastructure for pre-school and extracurricular care to meet the strong demand…
Business Parc, Prilly
Prilly, Switzerland
Start of construction: June 2013
On the former site of the Bobst company, now based in Mex (VD), this disused industrial area in Prilly is coming back to life. At the crossroads of Route de Renens and Route des Flumeaux, the project has a special role to play…
Renergia waste incineration plant
Renergia Zentralschweiz, Switzerland
Start of construction:
August 2012
Construction volume (value of our services):
6 M EUR
Costs converted according to average yearly exchange rates during project realization
Renergia in Perlen (LU) is a modern and environmentally friendly waste incineration plant.
Sportpark Bergholz
Wil, Switzerland
Start of construction:
August 2012
Construction volume (value of our services):
46,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Overall renovation of the sports and recreational facility.
Modulis Business Park, Versoix
Versoix, Switzerland
Start of construction: June 2012
Versoix, an attractive town on the Léman with a population of 13,000, is planning to develop a new regional business centre while retaining its rural charm.
Bon Park, Quartier de la Chapelle
Grand-Lancy, Switzerland
Start of construction: June 2012
The new La Chapelle neighbourhood in Geneva comprises eighteen buildings with residential and commercial space as well as a large public park and represents a major urban development project.
Center de Chirurgie Ambulatoire, Lausanne
Lausanne, Switzerland
Start of construction: June 2012
The new building is located in the immediate vicinity of the CHUV (Centre Hospitalier Universitaire Vaudois) on Avenue de Beaumont and houses six rooms for outpatient surgery in its lower part, which are mainly dedicated to the…
Flumeaux 41, Prilly
Prilly, Switzerland
Start of construction: June 2012
Built on the site of the former HIFIPAC factory, the administration building is seen by numerous passers-by and motorists traveling in this fast-growing industrial district. This prime location presented the owner with the…
En Pontet - Center scolaire et crèche, Echichens
Colombier, Switzerland
Start of construction: June 2012
In the spring of 2006, the planned merger of the four municipalities of Colombier, Echichens, Monnaz and St. Saphorin-sur-Morges led to the formation of a working group to replace three outdated classrooms in Colombier and to the…
Herisau Kasernenareal
Herisau, Switzerland
Start of construction:
May 2012
Construction volume (value of our services):
25,3 M EUR
Costs converted according to average yearly exchange rates during project realization
In June 2012, the foundation stone was laid in Herisau for the planned adaptations to the barracks buildings. The intact load-bearing structure and the existing generous room layout in the multi-storey old building made of…
Hochhaus Park Tower
Zug, Switzerland
Start of construction:
January 2012
Construction volume (value of our services):
79,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Park Tower high-rise building
Terre Bonne Park, Centre administratif
Eysins, Switzerland
Start of construction: June 2011
Located 15 minutes from Geneva International Airport, 20 minutes from Lausanne and served by TPN (Transports publics de Nyon), "Terre Bonne Park" offers all the features that can attract international companies looking for a…
CUG, Cité Universitaire
Genève, Switzerland
Start of construction: June 2011
The Cité universitaire de Genève is located on the heights of the residential neighbourhood of Champel and has been home to students from all over the world for several generations.
Le Pré-Du-Mont, Lausanne
Le Mont-sur-Lausanne, Switzerland
Start of construction: June 2011
With 42 condominiums, this project blends harmoniously into a pleasant environment that forms the transition between residential areas and a site area reserved for services and ancillary activities. The slope of the plot allows a…
UEFA Bois-Bougy, Nyon
Nyon, Switzerland
Start of construction: June 2011
The administrative building in Bois-Bougy is now part of the new UEFA campus. The main project of former President Michel Platini is to promote a healthy image of football and the associations that govern it, through the notions…
Center CSS Romandie, Lausanne
Lausanne, Switzerland
Start of construction: June 2011
The plot is part of the cantonal development plan (PAC) for the Biôpole site, which is primarily intended to accommodate companies from the health and medical sciences sectors.
Résidence La Miroiterie, Lausanne
Lausanne, Switzerland
Start of construction: June 2011
This neighborhood was relatively unsightly for several decades due to its industrial vocation, its proximity to the Sébeillon paths and the marginal activities of all kinds that developed there. This plot opposite the Ecole des…
Sallivaz Vergers, Chavannes-de-Bogis
Chavannes-de-Bogis, Switzerland
Start of construction: June 2011
The "Sallivaz Vergers" residential area is the continuation of the first stage, "Sallivaz Village", which began in 2010 with the construction of three buildings with a total of 29 apartments. The new buildings are located in the…
Les Grands Champs, Epalinges
Epalinges, Switzerland
Start of construction: June 2011
At the exit of the municipality of Epalinges above Lausanne, there was a large field of 9,200 square meters bordered by a wooded hill, an avenue of trees and the Berner Strasse. A tennis hall and a former carpentry workshop were…
Flon Pépinières, Lausanne
Lausanne, Switzerland
Start of construction: June 2011
Located in the heart of Lausanne, the Flon district is a reference for the city, both topographically and morphologically and in terms of revitalizing the city center. Built in the old bed of the Flon river on an artificial…
Grands-Champs, Epalinges
Epalinges, Switzerland
Start of construction: June 2011
At the exit of the commune of Epalinges, on the heights of Lausanne, there was a large field of 9,200 square meters bordered by a wooded hill, an avenue of trees and the Bern road. Following the demolition of the tennis hall and…
Central Parc, Nyon
Nyon, Switzerland
Start of construction: June 2011
The building is part of a neighbourhood plan that aims to urbanize a green valley in the immediate vicinity of the city center, north of Nyon railroad station. The building complex is a completely new quarter in the heart of Nyon…
OMC Extra Muros
Romont, Switzerland
Start of construction: January 2011
Respond to growth and consolidate all activities on a single site. The WTO's current headquarters is located in Geneva and houses approximately 900 staff. It houses the various departments of the Secretariat, as well as…
LCA Supercomputing Center
Lugano, Switzerland
Start of construction:
July 2010
Construction volume (value of our services):
35,5 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction LCA Supercomputing Center Turnkey construction Construction and building services work Office building with four floors
Extension du Campus des Nations
Grand-Saconnex, Switzerland
Start of construction: June 2010
The new building was erected on an 18,993 square metre site, the school's existing location in the municipality of Grand-Saconnex. It complements the school built in 2004-2005, which already occupied 3,500 square metres and was…
Beaulieu, Halles Sud, Lausanne
Lausanne, Switzerland
Start of construction: June 2010
The exhibition hall, which formed the south wing of the Beaulieu complex in Lausanne, no longer met the requirements of a modern multi-purpose facility with its half levels. As part of a major modernization project for the entire…
BrainServe SA, DataCenter, Crissier
Crissier, Switzerland
Start of construction: June 2010
The building stands on a 6,500 m2 plot of land in an industrial and commercial zone on the site of an old factory. The building is to house electronic data processing centers and corresponds to a program whose keyword is "global…
Sallivaz Village, Chavannes-de-Bogis
Chavannes-de-Bogis, Switzerland
Start of construction: June 2010
Sallivaz Village is the result of a merger of two plots of approximately 6,389 m2 located in a village zone in the heart of the commune of Chavannes-de-Bogis, 10 minutes from Nyon and 15 minutes from Geneva. The new residential…
Center Socio Culturel, Ecublens
Ecublens, Switzerland
Start of construction: June 2010
The Le Croset municipal site, which covers just over one hectare, is located in a central area of Ecublens and is adjacent to two shopping centers, several schools, the town's public services, the swimming pool and numerous…
Résidence du Bois 29 A-B, Ecublens
Ecublens, Switzerland
Start of construction: June 2010
New center of the municipality. The center of Ecublens is moving from Le Motty to Le Croset. The municipal site, which covers just over one hectare, is adjacent to the Coop and Migros shopping centers, several schools, the town's…
L'Epi d'Or, Cugy
Cugy, Switzerland
Start of construction: June 2010
The municipality of Cugy, just outside Lausanne, has seen a sharp increase in its population. During the period in which the "L'Épi d'Or" project was realized, the number of inhabitants rose from around 2,400 to 2,800. …
Bon-Park
Lancy, Switzerland
Start of construction: August 2009
A place to (re)invent. Eighteen buildings, tens of thousands of square meters of housing, three thousand five hundred inhabitants planned, commerce and a large public park: the new district of La Chapelle is a major urban…
AGENHOR SA
Meyrin, Switzerland
Start of construction: June 2009
An industrial building of modest size, this exemplary project offers industrial and administrative spaces developed on two levels and suitable for any possibility of development over time.
Villas Bois des Arts, Thônex
Thônex, Switzerland
Start of construction: June 2009
The plot is located in the villa zone of the municipality of Thônex and has an area of 10,284 square metres with a beautiful south/south-east orientation. The plot offers space for thirteen villas, which are connected by a…
Résidence du Château, St-Livres VD
St-Livres, Switzerland
Start of construction: June 2009
The municipality of Saint-Livres is located on La Côte, above Aubonne and Lavigny, with views of Lake Geneva and the Alps. The "Résidence du Château" forms a significant extension to the north of the village for a community of…
Résidence Beau-Séjour, Nyon
Nyon, Switzerland
Start of construction: June 2009
The 4,766 m2 plot, formerly used for agricultural purposes, is part of a neighborhood plan whose rather restrictive rules stipulated a division into four blocks connected by stairwells and elevators. The buildings represent a new…
Résidence Pré-Fleuri, Nyon
Nyon, Switzerland
Start of construction: June 2009
Building C of the "Le Boiron" district plan in Nyon is intended exclusively for residential purposes and offers 35 apartments designed and built for sale as individual properties. (PPE)
Chemin des Fins 5 à 5C, Grand-Saconnex
Grand-Saconnex, Switzerland
Start of construction: June 2008
The town of Grand-Saconnex is under strong demographic pressure due to the completion of two neighbourhood plans, namely Le Pommier and Chemin des Fins. Nevertheless, the infrastructure has not been neglected and the…
Domaine de Maisonneuve
Vernier, Switzerland
Start of construction: June 2008
The Plan localisé de quartier de Maisonneuve was initiated in 1986 and led to planning permission 20 years later.
Urbania, Genève
Genève, Switzerland
Start of construction: June 2008
The building stands on a 1,500 square metre plot in place of the Roseraie temple in the heart of Geneva, between the hospital, Carouge and Plainpalais, not far from the banks of the River Arve.
Lancy Les Mouilles II
Petit-Lancy, Switzerland
Start of construction: June 2008
Lancy-centre is an extension of a shopping centre built some twenty years ago on the edge of the Route de Chancy alongside two bank buildings that cover the Collège de Saussure.
Wipo-Ompi, Genève
Genève, Switzerland
Start of construction: June 2008
The World Intellectual Property Organisation (WIPO) employs around 1,300 people at its site in Geneva, near the Place des Nations. The building completes a complex of five buildings and this new stage of development materialises…
Métropole Lausanne
Lausanne, Switzerland
Start of construction: June 2008
The Métropole complex is considered the "oldest shopping center in Lausanne" and is a major attraction for the west of the municipality. It is located at the junction of Rue des Terreaux, the eastern exit of Place Chauderon, and…
Migros Interio, Etoy VD
Etoy, Switzerland
Start of construction: June 2008
Halfway between Lausanne and Rolle, served by the Aubonne highway junction, the "Littoral Parc" industrial and commercial area stretches between the highway and the cantonal road over a long stretch shared by the municipalities…
Les Résidences du Bois, Vers-Chez-Les-Blancs VD
Lausanne, Switzerland
Start of construction: June 2008
In the municipality of Lausanne, in Vers-chez-les-Blanc, the Route de Marin meets the Route de la Claie-aux-Moines in the direction of Savigny. The location is pleasant and privileged for those who like to live in the countryside…
En Belle-Vue, Renens VD
Renens, Switzerland
Start of construction: June 2008
The staggered arrangement of the buildings allows optimum views from the apartments.
Rue de Genève 75
Lausanne, Switzerland
Start of construction: June 2008
This building was constructed in 1959 and is fairly typical of the buildings erected at that time, both in terms of its design and execution.
Philip Morris International, Avenue de Cour 107
Lausanne, Switzerland
Start of construction: June 2008
Following the construction and commissioning of its new operations center, the Group began renovating its original building to enable full integration into the site's functional and qualitative organization.
Easy Day, Etablissement Hospitaliers du Nord Vaudois
Yverdon-les-Bains, Switzerland
Start of construction: June 2008
The building meets a growing demand in the field of outpatient surgery and, as a first step, provides the necessary space to relieve the pressure on the current buildings.
Philip Morris International, Crèche Rhodanie Campus, Lausanne
Lausanne, Switzerland
Start of construction: June 2008
The daycare center that PMI has built next to its new center in Lausanne is embedded in a sloping terrain that forms a series of gardens. The gardens are a continuation of the park adjacent to the company's headquarters. …
Route du Bois-des-Frères, Vernier
Vernier, Switzerland
Start of construction: June 2007
The buildings are located on three adjacent plots totalling 4,500 square metres in development zones 4B and 5 on the corner of Route du Bois-des-Frères and Route d'Aïre in the municipality of Vernier.
Résidence les Tilleuls, Chavannes
Chavannes-près-Renens, Switzerland
Start of construction: June 2007
The building is located on a flat plot with a balanced geometry on the edge of a medium-density development area.
EMS Le Pacific, Etoy
Etoy, Switzerland
Start of construction: June 2007
The 9,260 m2 plot borders the Etoy industrial estate, halfway between Morges and Rolle. The construction of a care home in this highly strategic industrial area, in the middle of a very dense customer pool, is an expression of…
Ilot du Centre, Blonay VD
Blonay, Switzerland
Start of construction: June 2007
The restructuring of the center of the municipality of Blonay has been a priority goal of the municipal administration for many years. In order to achieve this goal, it has taken the necessary steps in parallel to master the land…
Center Sportif de la Châtaigneraie, Founex VD
Founex, Switzerland
Start of construction: June 2007
The building, with a volume of 22,400 SIA cubic meters, includes a double gymnasium with stands for 200 people, a multi-purpose hall, a public hall and a bar, which are to be integrated into the Châtaigneraie complex. …
Les Pommes d'Or
Veyrier, Switzerland
Start of construction: June 2006
The two building lots, each with four semi-detached houses, meet the continuing demand for high-quality detached houses that combine several criteria that are valued by modern young middle-class families.
Caserne des Pompiers
Vésenaz, Switzerland
Start of construction: June 2006
The fire brigade's premises, which have been located in the centre of the village of Collonge for decades, no longer met the requirements and constraints to which this public service is subject today.
Centre d'Activités Onex-Jardins
Onex, Switzerland
Start of construction: June 2006
The building is located on the border between the municipalities of Onex and Lancy on the Avenue des Grandes-Communes. Its set-back position defines a space that marks the entrance to the town of Onex on the one hand and…
Permanent Mission of Singapore in Geneva
Genève, Switzerland
Start of construction: June 2006
The building is part of a local neighbourhood plan that also includes a residential building, which was planned and built by the same planners and the same general contractor.
Conforama, Villeneuve
Villeneuve, Switzerland
Start of construction: June 2006
The building is located in the industrial zone of Villeneuve and is part of the "Pré-neuf II" district plan, which was legalized in 2005. Its location in an industrial and commercial development area, at the mouth of the Rhône…
Rue Marteray 33, Lausanne
Lausanne, Switzerland
Start of construction: June 2006
The building is a residential building in the city center of Lausanne that illustrates the typology and arrangement of terraced houses along the historic axes leading into the city. The relatively quiet Rue Marterey, along which…
Rue Caroline 15, Lausanne
Lausanne, Switzerland
Start of construction: June 2006
It runs from south to north and forms a link between the traditional shopping district of Rue de Bourg and the newer developments upstream towards the Cité Hospitalière.
CISCO Systems, Rolle
Rolle, Switzerland
Start of construction: June 2006
The client's decision to locate its technology center in Rolle is strongly linked to the presence of EPFL and the potential for the creation of high value-added companies in French-speaking Switzerland. To demonstrate the…
Métraux Transports, Savigny
Savigny, Switzerland
Start of construction: June 2006
This building is located in the municipality of Savigny within the perimeter of the "PPA la Claie aux Moines 2" land-use plan and borders on the Claie aux Moines cantonal road.
O2
Onex, Switzerland
Start of construction: April 2006
An extension in continuity. The "O2" building extension is located at the junction of the communes of Onex and Lancy, along the Avenue des Grandes-Communes. It is the second stage of a project for an activity building established…
Fiedler SA
Carouge, Switzerland
Start of construction: June 2005
The new 20,000 cubic metre SIA is located on a 3,000 square metre site on the slope of a hill that marks the transition between the La Praille industrial area and the surrounding countryside just outside Geneva.
Le Jonc, Grand-Saconnex
Le Grand-Saconnex, Switzerland
Start of construction: June 2005
The buildings stand on a beautiful plot with a gentle slope in a quiet neighbourhood in the municipality of Grand-Saconnex.
Lancy Innovation Center
Petit-Lancy, Switzerland
Start of construction: June 2005
Located at the end of a development area with high-quality buildings, the approximately 11,000 square metre site was home to the activities of an Implenia Group company for many years. In the 1990s, the site was gradually…
Montfleury Parc, Versoix
Versoix, Switzerland
Start of construction: June 2005
This imposing building with 48,736 cubic metres of SIA stands on a plot of 14,961 square metres in development zone 4B in the municipality of Versoix. It forms a new extension to the Montfleury neighbourhood, which is bordered by…
La Jaquière, Epalinges
Epalinges, Switzerland
Start of construction: June 2005
The project, with a total volume of 7,500 m3 SIA, consists of 12 condominiums in 6 adjoining villas. The project is the third stage of an overall plan of 12 adjoining residential groups regulated by a development plan adopted in…
Planchamp-Dessous, Montreux
Clarens, Switzerland
Start of construction: June 2005
The project is the result of a resumed study developed on the basis of an initial building permit granted in 2002 and concerns the upgrading of a plot of 7,083 m2 located in a neighborhood above Montreux made up of villas, some…
Les jardins de Tavel, Montreux
Clarens, Switzerland
Start of construction: June 2005
The hamlet of Tavel is located above Montreux on the territory of this municipality in a remarkable location, away from the major traffic flows and with a sweeping view of the panorama of Lake Geneva. The nearby river "La Baye",…
Parking de la Duche, Nyon
Nyon, Switzerland
Start of construction: June 2005
Between the lake and the castle, in a very sensitive area, the parking garage serves the old town and the Rive district. The project, which is accessed exclusively via paths that do not lead through the center, was born out of…
Bâtiment Extranef, Chavannes-près-Renens
Chavannes, Switzerland
Start of construction: June 2005
According to the 1967 master plan, the Dorigny site is divided into three zones, which are assigned to the Faculty of Science in the west, the common rooms in the middle and the Faculty of Humanities in the east. The latter zone…
Sablon 2-4, Morges
Morges, Switzerland
Start of construction: June 2005
The building is part of the "Sablon-Nord" district plan in Morges, which is located not far from the town center and the SBB train station. The ordinance, which was legalized in 1989, permits the establishment of administrative,…
Generali, Nyon
Nyon, Switzerland
Start of construction: June 2005
The headquarters of the Generali insurance group in western Switzerland occupies a 4,921 m2 plot of land included in the "Perdtemps-St-Jean" district plan in Nyon. It is adjacent to the SBB site, i.e. in the immediate vicinity of…
Coopérative INTI
Confignon, Switzerland
Start of construction: June 2004
The 19 flats and the underground car park with 22 parking spaces defined in the programme are located on a plot of 2,311 square metres with a total volume of 12,145 cubic metres SIA. The plot is located in the municipality of…
Ecole Internationale de Genève
Grand-Saconnex, Switzerland
Start of construction: June 2004
At the time, the school had 3,770 pupils spread across three sites in the Geneva region. With the construction of the building presented here, the school was able - at least in an interim phase - to cope with the steady influx of…
Résidence "Le Moulin Vert"
Aire-la-Ville, Switzerland
Start of construction: June 2004
The residential development, which is to be sold as a condominium, comprises a total of more than 19,000 cubic metres of SIA and offers a gross living area of 3,776 square metres just outside the Geneva conurbation. …
Mairie 35, Genève
Genève, Switzerland
Start of construction: June 2004
The building is located on the corner of Rue de la Mairie and Rue du Nant in the city of Geneva, close to a major transport axis.
Pailly Logement, Vernier
Vernier, Switzerland
Start of construction: June 2004
The building stands on a 2,480 square metre plot of land that is integrated into a neighbourhood plan of the municipality of Vernier.
Résidences du Boiron, Nyon
Nyon, Switzerland
Start of construction: June 2004
The two new buildings are situated in a pleasant location on the border with the municipality of Nyon. The steeply sloping terrain offers a view of a green and peaceful space formed by the strip of forest that fills the valley…
Rue Du Torrent, Vevey
Vevey, Switzerland
Start of construction: June 2004
The plot for this building with 41 large rental apartments marks the corner of Rue du Torrent and Rue de la Madeleine, halfway between the Veveyse and Place du Marché.
Parking du Rôtillon, Lausanne
Lausanne, Switzerland
Start of construction: June 2004
The Rôtillon district in Lausanne is one of the places where the city originally developed. It is located on the left bank of the Flon valley, which runs through the historic center from east to west. Clinging to the steep slope…
EPFL AI, Ecublens
Lausanne, Switzerland
Start of construction: June 2004
The building is located on the grounds of the Ecole Polytechnique Fédérale de Lausanne (EPFL), in line with the "AI" building, which itself was completed in 2002 when the third development stage of the university was implemented…
Philip Morris International Rhodanie Campus
Lausanne, Switzerland
Start of construction: June 2004
Philip Morris International has been based in Lausanne for many years at several locations, including Chemin du Liseron, Avenue de Brillancourt and Avenue de Cour. In June 2002, after acquiring an existing administrative building…
Les Hauts-de-Coppet, Coppet
Coppet, Switzerland
Start of construction: June 2004
The "Les Hauts de Coppet" estate is located in the upper part of the club resort, just a few hundred meters from the famous castle. It stretches between the lake and the Jura on a plot of 15,000m2.
Extension GPMG, Montreux
Montreux, Switzerland
Start of construction: June 2004
70 parking spaces between the platforms of Montreux station. The Park + Rail parking lot at Montreux railroad station, which opened in 1997, is located in the town center and offers direct access to the SBB - MOB…
Rue du Lac 128, Clarens
Clarens, Switzerland
Start of construction: June 2004
The residence enjoys a breathtaking view of Lake Geneva and is located on the border between the commercial area and the residential area of Clarens.
Amedis, Puidoux
Puidoux, Switzerland
Start of construction: June 2004
The plot consists of a flat piece of land with an area of around 23,000 m2. The location is ideal for the construction of a pharmaceutical distribution center, which is within easy reach of the largest urban centers in…
Avenue Dapples 24-26-28, Lausanne
Lausanne, Switzerland
Start of construction: June 2004
Built in 1932 in the Sousgare district, this classic Lausanne building is a fine example of civic architecture, just a few meters from the metro line that will disappear to make way for the new M2 line.
Rue Du Simplon 35, Vevey
Vevey, Switzerland
Start of construction: June 2004
Built in 1964, the building is in a prime location in the heart of Vevey, close to stores and public transport.
Usine EgoKiefer, Villeneuve
Villeneuve, Switzerland
Start of construction: June 2004
The EgoKiefer Group, the number one in the Swiss window and door business, had to react as quickly as possible to the very high order volume, which exceeded its production capacity. Expanding one of the production facilities was…
Parking des Rayes
Vésenaz, Switzerland
Start of construction: June 2003
The Les Rayes public car park commissioned by the municipality of Collonge-Bellerive is located on the road of the same name at the exit of the old village centre of Vésenaz on municipal land in the eastern part of the village. …
Le Train Bleu, Genève
Genève, Switzerland
Start of construction: June 2003
The building was erected on a former industrial and commercial site of 3,487 square metres and contributes to the upgrading of the site by creating a residential complex. It thus makes a decisive contribution to the integration…
Saint-Jean 21-29, Genève
Genève, Switzerland
Start of construction: June 2003
The two new buildings, which belong to an institutional investor, were erected on a plot of land between Rue St. Jean and Rue Miléant in Geneva and contribute to the densification of a neighbourhood that was previously partly…
Les Platanes C, Prilly
Prilly, Switzerland
Start of construction: June 2003
In an environment of good quality, the plot of 1,960 m2 allows the realization of a building with four floors plus attic, entirely intended for apartments.
Les Portes de Nyon, Nyon
Nyon, Switzerland
Start of construction: June 2003
The four buildings are located on Route du Boiron, on the north-western edge of the town of Nyon.
Résidence du Rhône, Aigle
Aigle, Switzerland
Start of construction: June 2003
The "Résidence du Rhône" is located in the heart of the town of Aigle, just a few hundred meters from the train station and the stores in the center, and offers a pleasant living space.
Sie SA, Crissier
Crissier, Switzerland
Start of construction: June 2003
The intermunicipal company based in the municipality of Crissier occupies a relatively flat and well-proportioned plot in the industrial zone, which is perfect for the construction of an industrial building that requires spacing…
Les Jardins d'Onex
Onex, Switzerland
Start of construction: March 2003
Former filling area. Located on the edge of the new city of Onex, the building benefits from a privileged situation with a magnificent view of the Jura and the cliffs of the Rhone. All amenities are nearby, shops and public…
Europlex Cinémas Flon, Lausanne
Lausanne, Switzerland
Start of construction: June 2002
The new Multisaal complex in the city of Lausanne contributes to the long-awaited redevelopment of the Flon Valley in the heart of the city, where the old freight station and the Port-Franc are located. The new building will be…
Philip Morris International Rhodanie 50 - Rénovation 1ère Phase
Lausanne, Switzerland
Start of construction: June 2002
The existing building was designed in the early 1960s by architect F. Brugger on behalf of Kodak SA and is terraced into the slope of the site. The building is characterized by simple and plain forms and has façades made of…
Les Jardins de Prélaz, Lausanne, Lot 1
Lausanne, Switzerland
Start of construction: June 2002
The Prélaz site is one of the last large contiguous plots of land in the city of Lausanne. It is located between an urban and industrialized area on the south side and a residential area on the north side.
Amrita Wellness, Montreux
Montreux, Switzerland
Start of construction: June 2001
Today's regular guests at major international palaces not only expect high-quality service, but also an offer that is adapted to changing lifestyles. This includes the possibility of practicing so-called "wellness" activities and…
Sur les Moulins, Denges
Lausanne, Switzerland
Start of construction: June 2001
The municipality of Denges is located between Morges and Lausanne and is part of a highly developed area in the agglomeration of the Vaud capital. Public and private services and connections in all directions are particularly…
Clinique Bois-Cerf, Lausanne
Lausanne, Switzerland
Start of construction: June 2001
The long-established Bois-Cerf clinic, located halfway between Ouchy and the Lausanne SBB railroad station, enjoys a good reputation and has long stood out among similar facilities in the Vaud capital. The Board of Directors has…
BCV Chauderon, Lausanne
Lausanne, Switzerland
Start of construction: June 2001
The impressive building, which dominates Place Chauderon in the west wing of the center of Lausanne, was built in 1908 as the headquarters of Crédit Foncier Vaudois and has been part of the bank's real estate holdings since the…
Complexe Hotelier La Barcarolle, Prangins
Prangins, Switzerland
Start of construction: June 2000
The cultural and sporting facilities of the village, glorified by the presence of Prangins Castle, have been strengthened in recent years by the creation of a recreational area near the port, to which has been added the…
Immeuble Les Platanes, Prilly
Prilly, Switzerland
Start of construction: June 2000
At the request of the owner, Société Sicpa, the 8,400 m2 of undeveloped land in the urbanization zone of the municipality of Prilly was subjected to a neighbourhood plan study.
Immeuble Figuiers B, Lausanne
Lausanne, Switzerland
Start of construction: June 1999
The northern and southern boundaries of the plot are defined by two busy axes: av. des Figuiers and av. de Rhodanie. These two roads converge and meet at the Maladière traffic circle, the south-western exit from the city of…
SUVA, Lausanne
Lausanne, Switzerland
Start of construction: June 1999
Suva, which has been based at Av. de la Gare 19 in Lausanne for 25 years, had been looking for a way to expand the space available to it for many years. Having been given the opportunity to acquire the two neighboring buildings,…
BDG, Lausanne
Lausanne, Switzerland
Start of construction: June 1999
The client, a bank that has long been based in its building on the corner of av. du Théâtre and rue Ch. Monnard in Lausanne, had extensive renovation work carried out on the 3,250 m2 gross floor area of its building from 1996…
Extension Usine Bobst, Mex
Mex, Switzerland
Start of construction: June 1999
As a renowned industrial company active in the production of machines for manufacturing cardboard packaging, the client already had a site in the triangle formed by the municipalities of Villars-Ste-Croix, Vufflens-la-Ville and…
Quartier D'habitations les Terailles, Cossonay-Ville
Cossonay-Ville, Switzerland
Start of construction: June 1997
The "Les Terrailles" settlement is located in the upper part of Cossonay, a medium-sized municipality between Lausanne and Yverdon-les-Bains in the heart of the canton of Vaud. The hamlet's current appearance is the result of a…
La Poste Center colis, Daillens
Daillens, Switzerland
Start of construction: June 1997
The rapid development of the entire economy in the 1990s prompted Swiss Post to take extensive reorganization measures, which were implemented at short notice. The aim was to adapt the company's resources to the expectations of a…
Les Vergers du Poyet, Aubonne
Lussery-Villars, Switzerland
Start of construction: June 1996
This complex of rental apartments was built thanks to the investment fund of a pension fund in Aubonne on an 8,993 m2 plot in the north-west of the old town.
Pont-Rouge
Lancy, Switzerland
The upcoming opening of CEVA will give a boost to the neighborhoods that will be revitalized by the new rail link. This is the case for the area around the Pont-Rouge station, which becomes the gateway to the city from the Lancy…
Pont-Rouge B4-B5
Lancy, Switzerland
The creation of CEVA has been the basis for a real estate revival along the route of this new rail link. The area around the Pont-Rouge station is a very good example of this, as it becomes the gateway to the city from the Lancy…
Motel One
Basel, Switzerland
Construction volume (value of our services):
19,3 M EUR
Costs converted according to average yearly exchange rates during project realization
Complete renovation of existing building containing offices and commercial premises, and conversion into a hotel with 143 rooms.
Schorenstadt
Basel, Switzerland
Construction volume (value of our services):
9,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Implenia`s flagship project for the 2000-Watt Society. This 65-unit housing development meets the latest requirements of the SIA path towards energy efficiency.
Strättligen housing estate
Thun, Switzerland
Construction volume (value of our services):
23 M EUR
Costs converted according to average yearly exchange rates during project realization
Renovation of a housing estate comprising eight three- to six-storey buildings with 138 rental apartments, keeping the exterior architectural appearance in line with the aesthetics of the period in which the homes were originally…
PARKSTRASSE 11, BERN
Bern, Switzerland
Construction volume (value of our services):
4,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Implenia was tasked with renovating the property at Parkstrasse 11 in Bern with its 40 apartments.
Avant-Poste
Lausanne, Switzerland
Construction volume (value of our services):
8,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Renovation of the property and the building shell, expansion and redevelopment of the ground floor, and extension of the property by construction of eight apartments.
Le Nouveau Prieuré
Chêne-Bougeries, Switzerland
Chêne-Bougeries, a pretty commune on the left bank, is experiencing, like all the agglomerations located on the outskirts of the city of Geneva, significant development. Today, between the Frontenex plateau and the Gradelle…
Quartier Coupe Gordon-Bennett
Vernier, Switzerland
A new life. After more than half a century as the site of the construction company Zschokke, which became Implenia in 2006, a 35,000 m2 site in the heart of Vernier has undergone a rapid and spectacular transformation in just a…
IAF Genève
Genève, Switzerland
Change of use in the course of studies. Launched in 2003, the project was the result of an architectural competition set up to create an extension to the WTO (International Trade Organization). The latter subsequently withdrew,…
UBS Corraterie - Confédération
Genève, Switzerland
A pilot project. In 2010, ten years after the end of the redevelopment of the urban block consisting of the building on rue de la Corraterie 5 and 7, known as the Camoletti building, adjoining the building on rue de la Cité 4 and…
Terre Bonne Park
Eysins, Switzerland
A real estate park of ten buildings. 15 minutes from Geneva International Airport, 20 minutes from Lausanne and served by the TPN (Nyon public transport), "Terre Bonne Park" has all the features likely to attract international…
Aux Armourins
Neuchâtel, Switzerland
Construction volume (value of our services):
24,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Refurbishment and extension of a commercial property to create a commercial building with eleven residential units
Petite-Prairie
Nyon, Switzerland
The land had been decommissioned some 15 years ago, but a farmer who owned 1.25% of the parcels concerned had managed to block the project until an agreement was finally reached. On 100,000 m2, in the north of Nyon, the new…
Résidences A26 - Ecoquartier Les Vergers
Meyrin, Switzerland
Ecoquartier. The new Ecoquartier des Vergers is the result of a competition organized by the commune of Meyrin (Geneva). It is developed on former agricultural parcels declassified in development zone 3 in 2006.
Les Résidences du Soleil
Meinier, Switzerland
Au cœur du village. Composé à l’origine de deux hameaux distincts, le village de Meinier se singularise par son noyau ancien et ses réalisations récentes (bâtiments locatifs ou villas) ayant considérablement modifié la structure…
Japan Tobacco Internationals
Genève, Switzerland
Japan Tobacco International (JTI) has been present in Geneva for half a century. Until October 2015, its thousand employees were spread over three buildings. The desire to regroup all the activities of its international…
Logitech EMEA, Morges
Ecublens, Switzerland
Since the initial studies, MCM Architecture's desire was to create a physical and emotional link between the new Logitech Center "Europe - Middle East - Africa" and the different regions of the world it represents, to bring them…
Résidence du Parc, Morges
Morges, Switzerland
The two new buildings on Rue de Lausanne are in a privileged location between Lausanne and Geneva. The new buildings are not far from the city center on the cantonal road along the lakeshore and benefit from their proximity to…
Migros Navigation
Genève, Switzerland
The building, located in a busy area in the Les Pâquis neighborhood, houses Migros and three other retailers. The complete renovation took place on a semi-occupied site.
Zurlindenstrasse 111
Zurich, Switzerland
Construction volume (value of our services):
10,8 M EUR
Costs converted according to average yearly exchange rates during project realization
In Zürich`s central Scmiede Wiedikon district, developers renovated the former Swisscom buildings into 20 loft apartments.
Allenmoosstrasse 116-120
Zurich, Switzerland
Construction volume (value of our services):
22 M EUR
Costs converted according to average yearly exchange rates during project realization
Complete renovation of eight multi-occupancy homes and building extension
Medienpark Flurstrasse 55
Zurich, Switzerland
Construction volume (value of our services):
54,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Timeless office / commercial building with sophisticated architecture, detached, with newly renovated office spaces covering approx. 16,000 square metres.
Address
Freiburg / Fribourg, Switzerland
Implenia Switzerland Ltd.
Route du Jura 37A
1700 Freiburg / Fribourg
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card