U-Bahn Betriebswerkstatt Billstedt
Short description
Construction of a subway maintenance workshop and washing hall: Industrial construction with in-situ concrete and precast reinforced concrete elements.
The project
Construction of a three-storey workshop building made from reinforced concrete, with dimensions 33 metres x 132 metres. The building project also includes construction of the foundations for a washing hall with dimensions 7.5 metres x 130 metres. Both buildings are constructed using a combination of in-situ concrete and precast reinforced concrete elements.
Services in detail
Earthworks, installation work, water drainage, reinforced concrete work, concrete core activation, earthing and lightning protection systems, track drainage, 1,800 precast reinforced concrete elements.
Challenges
The challenge here lay in completing the construction work on the central ‘island’ between two tracks with railway services still running.