Reinforced concrete clarifying tank with a diameter of 24 m – pumping station based on a three-chamber system.
The project
- Reinforced concrete clarifying tank with a diameter of 24 m
- Pumping station based on a three-chamber system
- Stringent requirements with regard to concrete quality and crack width restriction
- Including necessary infrastructure measures such as an office building, pipeline construction, outdoor facilities and road construction
- Construction period: 5 months