Challenges
- Shell construction time 9 months
- Coordination with element system construction
- Wall formwork up to 6.0m
- Staircase with climbing formwork
- Helix (road ramp)
- High standards for occupational safety
Further information
Technical data
12'400m3 concrete
1050 to reinforcement