pdf,
154,4 KB
20230427_MM_SUS-Report_final_EN.pdf
Düsseldorf (DE), and the 26,500 truck trips the company is saving at the Brenner Base Tunnel (AT) thanks to its own local tubbing plant. For Berlin Decks (DE) Implenia is constructing a 3,500 m2 ceramic facade made from natural raw materials produced in the region, and at the new safety tunnel it is building[...]