Varberg Tunneln FAS 2

Vårberg, Sweden

Start of construction: December 2018

Construction volume (value of our services): 328 M EUR

The project comprises the two-lane extension of the Varberg-Hamra section, which is part of the Västkustbanan railway line connecting Göteborg with the southern Swedish city of Lund. As part of an Early Contractor Involvement contract (ECI con-tract), Implenia was initially awarded with the Preliminary Design (Phase 1) in June 2018, and subsequently with the Detailed Design and Construction (Phase 2) in September 2019.

Citylink Anneberg-Skanstull Tunnel

Stockholm, Sweden

Start of construction: December 2018

Construction volume (value of our services): 90 M EUR

As the second of four phases of the so-called City Link Project, the Anneberg-Skanstull Tunnel serves to improve the power supply in the Greater Stockholm area. At a length of around 14 km and a diameter of 5 m, the tunnel is being driven about 50 - 100 m below the Swedish capital using a tunnel boring machine.

Slussen SN91

Stockholm, Sweden

Start of construction: January 2018

Construction volume (value of our services): 77 M EUR

Extensive rock and concrete work at Katarina Mountain

Rönnskär - Repository

Skellefteå, Sweden

Start of construction: January 2018

Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock excavation chambers with high crack protection, located around 330 m below sea level below the smelter. The contract is the first won by Implenia Sverige AB for the mining industry. The project has a duration of 3 years, starting in January 2018.