Semmering Base Tunnel SBT Lot 1.1

Maria Schutz, Austria

Start of construction: December 2014

Construction volume (value of our services): 457 M EUR

The approximately 27.3 km long Semmering Basistunnel is one of the most important and complex infrastructure projects in the heart of Europe. This double-tube railway tunnel is located between Gloggnitz and Mürzzuschlag, linking the two federal states of Lower Austria and Styria. As part of the new southern railway, which is the central axis on the trans-European route from the Baltic Sea to the Adriatic Sea, it represents a sustainable investment in both Austrian and European rail infrastructure.

[Translate to English:] U3 Nürnberg

Metro Subway Nuremberg U3, BA 2.1

Nuremberg, Germany

Start of construction: July 2014

Construction volume (value of our services): 43 M EUR

In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west section 2.1, extends from “Gustav-Adolf-Straße” station to the border of section 2.2 in direction to “Kleinreuth” station.

[Translate to English:] Chefs Culinar Nord, Hamburg

Chefs Culinar Nord, Hamburg

Hamburg, Germany

Start of construction: December 2014

During the expansion of the Hamburg site, a particular focus was placed on energy-efficient construction methods.

[Translate to English:] Chempark Dormagen

CHEMPARK Dormagen

Cologne, Germany

Start of construction: December 2014

Construction volume (value of our services): 4,7 M EUR

Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer

[Translate to English:] Neubau einer Werk-, Lager- und Logistikhalle mit Verwaltungsgebäude

Construction of a workshop, warehouse and logistics hall with office building

Saarbrücken, Germany

Start of construction: November 2014

Construction volume (value of our services): 21,6 M EUR

Turnkey construction for GIU

[Translate to English:] Wärmespeicher Dessau

Heat accumulator, Dessau

Dessau-Roßlau, Germany

Start of construction: November 2014

Construction volume (value of our services): 1,31 M EUR

Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau

TG Syrlinstrasse

Ulm, Germany

Start of construction: October 2014

The tests carried out on the floor slab and ramp showed cracks in large areas that could not be bridged by the applied surface protection system.

Alter Wall Hamburg

Hamburg, Germany

Start of construction: October 2014

Construction volume (value of our services): 14,572 M EUR

Behind the historic façades of the Alter Wall 2-32 ensemble, around 23,000 m² of modern office space and around 12,000 m² of high-quality retail space are to be created between Alsterfleet, City Hall, Rathausmarkt and the Chamber of Commerce.

Schwabengarage, Stuttgart

Stuttgart, Germany

Start of construction: September 2014

The draft of the cathodic corrosion protection system with protective current (repair principle "K" according to RiLi of the DAfStB) is based on the specifications of the planning engineering office.

[Translate to English:] Erweiterung Testanlage für Brandschutzglas

Expansion of testing facility for fire safety glass

Gelsenkirchen, Germany

Start of construction: August 2014

Construction volume (value of our services): 500.000 EUR

Expansion of the fire safety glass testing facility of the NS Group, Pilkington Gelsenkirchen plant.

[Translate to English:] Neubau Produktionsgebäude 4

Construction of new production building 4

St. Wendel, Germany

Start of construction: August 2014

Construction volume (value of our services): 4,8 M EUR

Construction of the new production building 4 at the St. Wendel site in the West industrial area.

TG Marktoberdorf

Marktoberdorf, Germany

Start of construction: July 2014

The repair concept for the renovation of the reinforced concrete components, protection of the support and wall bases, provides for the principle "K" (cathodic corrosion protection) according to RL-SIB 2001 of the German Committee for Reinforced Concrete (DAfStb).

[Translate to English:] Trinkwasserhochbehälter Bamberg

Elevated water tank in Bamberg

Bamberg, Germany

Start of construction: April 2014

Construction volume (value of our services): 2,87 M EUR

An elevated container with a usable capacity of 10,000 cubic metres was constructed above Bamberg old town in order to ensure a continuous supply of drinking water.

Danube bridge

Tuttlingen, Germany

Start of construction: April 2014

New construction of the Danube bridge as a 2-span bridge in Tuttlingen

[Translate to English:] Elbchaussee 139a

Elbchaussee 139a

Hamburg, Germany

Start of construction: February 2014

Construction volume (value of our services): 1,3 M EUR

According to the plans of the architects gmp von Gerkan, Marg und Partner, the residential building with the curved facades was built in 2014 on Hamburg's noble Elbchaussee.