Map view

Semmering Base Tunnel SBT Lot 1.1

Maria Schutz, Austria

Start of construction: December 2014

Construction volume (value of our services): 457 M EUR

The approximately 27.3 km long Semmering Basistunnel is one of the most important and complex infrastructure projects in the heart of Europe. This double-tube railway tunnel is located between Gloggnitz and Mürzzuschlag, linking the two federal states of Lower Austria and Styria. As part of the new southern railway, which is the central axis on the trans-European route from the Baltic Sea to the Adriatic Sea, it represents a sustainable investment in both Austrian and European rail infrastructure.

[Translate to English:] ETH HWW Living Science

ETH HWW Living Science

Zurich, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 2,26 M CHF

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

Dangelweg 1/3

Zurich-Wollishofen, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 9,2 M CHF

Conversion and addition of a new storey to residential building with 42 flats

New building Parking II Roche

Kaiseraugst, Switzerland

Start of construction: September 2014

Construction volume (value of our services): 12,1 M CHF

New construction of a parking garage with 9 parking decks, 2 access spirals and 4 staircases in in-situ concrete and elements

[Translate to English:] Schulhaus Hasel

Hasel School

Spreitenbach, Switzerland

Start of construction: August 2014

Construction volume (value of our services): 1.000 CHF

Dismantling down to the primary structure, including site remediation; renovation of the existing school building and extension of the building and construction of a sports hall.

Schoren Skyscrapers

Basel, Switzerland

Start of construction: June 2014

Construction volume (value of our services): 12 M CHF

The new high-rise building comprises two buildings (16 and 18 floors).

Conversion and extensions to school building, Hasel

Spreitenbach, Switzerland

Start of construction: May 2014

Construction volume (value of our services): 21,5 M CHF

The municipality of Spreitenbach decided to renovate the original 1960s building, because the school no longer met today’s requirements and was clearly a candidate for major refurbishment.