Results: 61

Subway line 17.1 - Paris Grand Paris Express

Paris, France

Start of construction: December 2018

Construction volume (value of our services): 441 M EUR

With a length of 27 km, line 17 extends over 13 municipalities in the departments of Seine-Saint-Denis, Val-d'Oise and Seine-et-Marne. It connects nine stations between Saint-Denis Pleyel and Le Mesnil-Amelot in less than twenty-five minutes and will facilitate the daily life of nearly 565,000 people.

Varberg Tunneln FAS 2

Vårberg, Sweden

Start of construction: December 2018

Construction volume (value of our services): 328 M EUR

The project comprises the two-lane extension of the Varberg-Hamra section, which is part of the Västkustbanan railway line connecting Göteborg with the southern Swedish city of Lund. As part of an Early Contractor Involvement contract (ECI con-tract), Implenia was initially awarded with the Preliminary Design (Phase 1) in June 2018, and subsequently with the Detailed Design and Construction (Phase 2) in September 2019.

Munich Marienhof station

München, Germany

Start of construction: December 2018

Construction volume (value of our services): 394,7 M EUR

The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.

Citylink Anneberg-Skanstull Tunnel

Stockholm, Sweden

Start of construction: December 2018

Construction volume (value of our services): 90 M EUR

As the second of four phases of the so-called City Link Project, the Anneberg-Skanstull Tunnel serves to improve the power supply in the Greater Stockholm area. At a length of around 14 km and a diameter of 5 m, the tunnel is being driven about 50 - 100 m below the Swedish capital using a tunnel boring machine.

Erneuerung Eisenbahnbrücken im Pegnitztal

Velden, Germany

Start of construction: November 2018

Construction volume (value of our services): 14,5 M EUR

Ersatzneubau von 3 Bestandsbrücken der DB-Strecke 5903 Nürnberg - Schirnding

Enclosure construction in Schwamendingen (Zurich) – noise protection measures

Zurich, Switzerland

Start of construction: September 2018

Construction volume (value of our services): 53,055 M CHF

Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.

RBS Section 1.2 Postparc – expansion of Bern train station

Bern, Switzerland

Start of construction: August 2018

Construction volume (value of our services): 13,7 M CHF

Sub-project involving the expansion of Bern train station

[Translate to English:] Fassadenaufzug

Global Tower, Frankfurt am Main

Frankfurt am Main, Germany

Start of construction: July 2018

The Global Tower is a high-rise building in Frankfurt’s banking district. It was constructed in 1974 and has undergone extensive revitalisation work since 2018.

Winterthur Town Village

Town Village, Winterthur, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 2,2 M CHF

A multi-use, multi-faceted development with a community focus.

Cantonal Hospital St.Gallen KSSG -Eastern switzerland Children's Hospital OKS

St. Gallen, Switzerland

Start of construction: March 2018

Construction volume (value of our services): 68 M CHF

Generation project in brief

Foreland bridge Neckar valley crossing, BAB A6 near Heilbronn

Heilbronn, Germany

Start of construction: March 2018

The Foreland bridge will be erected as a two-legged T-beam using the advancing method. Tendons of the types BBV L22 and BBV L15 are installed here.

[Translate to English:] Visualisierung einer Tagesansichtdes Projekts

KÖ-Bogen II, Düsseldorf

Düsseldorf, Germany

Start of construction: February 2018

The KÖ-Bogen II development, which is part of a major inner-city project, is situated at the heart of Düsseldorf.

N01/42, 46 UPlaNS junction Zurich East – Effretikon

Wallisellen, Switzerland

Start of construction: February 2018

Construction volume (value of our services): 78,88 M CHF

Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.

Pfädchensgraben viaduct, A 61

Rheinböllen, Germany

Start of construction: January 2018

The two existing superstructures of the valley bridge will be demolished and replaced by new superstructures.

Slussen SN91

Stockholm, Sweden

Start of construction: January 2018

Construction volume (value of our services): 77 M EUR

Extensive rock and concrete work at Katarina Mountain