Semmering Base Tunnel SBT Lot 1.1

Maria Schutz, Austria

Start of construction: December 2014

Construction volume (value of our services): 457 M EUR

The approximately 27.3 km long Semmering Basistunnel is one of the most important and complex infrastructure projects in the heart of Europe. This double-tube railway tunnel is located between Gloggnitz and Mürzzuschlag, linking the two federal states of Lower Austria and Styria. As part of the new southern railway, which is the central axis on the trans-European route from the Baltic Sea to the Adriatic Sea, it represents a sustainable investment in both Austrian and European rail infrastructure.

Semmering Base Tunnel SBT Lot 2.1

Steiermark, Austria

Start of construction: December 2013

Construction volume (value of our services): 623 M EUR

The planned Semmering Base Tunnel (SBT) is currently one of the most important large-scale infrastructure projects in the heart of Europe, and forms part of the new Austrian southern railway, a central axis on the trans-European route from the Baltic to the Adriatic. With an overall length of 27.3 km, the SBT links Lower Austria with Steiermark. Österreichische Bundesbahn [Austrian Railways] has appointed Implenia as part of a consortium with Swietelsky for the construction of central Lot 2.1, a section about 13 km in length.

[Translate to English:] ETH HWW Living Science

ETH HWW Living Science

Zurich, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 2,26 M CHF

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

Dangelweg 1/3

Zurich-Wollishofen, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 9,2 M CHF

Conversion and addition of a new storey to residential building with 42 flats

New building Parking II Roche

Kaiseraugst, Switzerland

Start of construction: September 2014

Construction volume (value of our services): 12,1 M CHF

New construction of a parking garage with 9 parking decks, 2 access spirals and 4 staircases in in-situ concrete and elements

Schoren Skyscrapers

Basel, Switzerland

Start of construction: June 2014

Construction volume (value of our services): 12 M CHF

The new high-rise building comprises two buildings (16 and 18 floors).

Conversion and extensions to school building, Hasel

Spreitenbach, Switzerland

Start of construction: May 2014

Construction volume (value of our services): 21,5 M CHF

The municipality of Spreitenbach decided to renovate the original 1960s building, because the school no longer met today’s requirements and was clearly a candidate for major refurbishment.

[Translate to English:] Jugendherberge Saas Fee

Construction of new wellness hostel Aqua Allin

Saas-Fee, Switzerland

Start of construction: October 2013

Construction volume (value of our services): 1,2 M CHF

Four story wood building with a ventilated wood façade.

[Translate to English:] ROY - Aussenansicht

ROY

Winterthur, Switzerland

Start of construction: September 2013

Construction volume (value of our services): 6,3 M CHF

The Minergie-compliant ROY building was constructed on a former industrial area in Winterthur's trendy Neuheigi district.

Funicular railway Schwyz-Stoos

Schwyz, Switzerland

Start of construction: May 2013

Construction volume (value of our services): 25 M CHF

The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle service with 2 vehicles for passenger and goods transport. Both vehicles run on a common track between the termini with Abt's diversion in the middle of the line.