E4 Förbifart, Johannelund tunnel

Vällingby, Sweden

Start of construction: December 2014

Construction volume (value of our services): 254 M EUR

The bypass “Förbifart” Stockholm is a link between the north and south of the capital of Sweden and intends to relieve the traffic through the city. The 21 km long bypass motorway, of which approximately 17 km are underground in a depth of up to 70 m, is divided into six lots. With the 3.6 km long Johannelund tunnel (Lot FSE 403), Implenia won the contract for one of the first lots.

Semmering Base Tunnel SBT Lot 1.1

Maria Schutz, Austria

Start of construction: December 2014

Construction volume (value of our services): 457 M EUR

The approximately 27.3 km long Semmering Basistunnel is one of the most important and complex infrastructure projects in the heart of Europe. This double-tube railway tunnel is located between Gloggnitz and Mürzzuschlag, linking the two federal states of Lower Austria and Styria. As part of the new southern railway, which is the central axis on the trans-European route from the Baltic Sea to the Adriatic Sea, it represents a sustainable investment in both Austrian and European rail infrastructure.

[Translate to English:] U3 Nürnberg

Metro Subway Nuremberg U3, BA 2.1

Nuremberg, Germany

Start of construction: July 2014

Construction volume (value of our services): 43 M EUR

In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west section 2.1, extends from “Gustav-Adolf-Straße” station to the border of section 2.2 in direction to “Kleinreuth” station.

[Translate to English:] Chefs Culinar Nord, Hamburg

Chefs Culinar Nord, Hamburg

Hamburg, Germany

Start of construction: December 2014

During the expansion of the Hamburg site, a particular focus was placed on energy-efficient construction methods.

[Translate to English:] ETH HWW Living Science

ETH HWW Living Science

Zurich, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 2,26 M CHF

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

[Translate to English:] Chempark Dormagen

CHEMPARK Dormagen

Cologne, Germany

Start of construction: December 2014

Construction volume (value of our services): 4,7 M EUR

Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer

Dangelweg 1/3

Zurich-Wollishofen, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 9,2 M CHF

Conversion and addition of a new storey to residential building with 42 flats

[Translate to English:] Neubau einer Werk-, Lager- und Logistikhalle mit Verwaltungsgebäude

Construction of a workshop, warehouse and logistics hall with office building

Saarbrücken, Germany

Start of construction: November 2014

Construction volume (value of our services): 21,6 M EUR

Turnkey construction for GIU

[Translate to English:] Wärmespeicher Dessau

Heat accumulator, Dessau

Dessau-Roßlau, Germany

Start of construction: November 2014

Construction volume (value of our services): 1,31 M EUR

Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau

TG Syrlinstrasse

Ulm, Germany

Start of construction: October 2014

The tests carried out on the floor slab and ramp showed cracks in large areas that could not be bridged by the applied surface protection system.

Alter Wall Hamburg

Hamburg, Germany

Start of construction: October 2014

Construction volume (value of our services): 14,572 M EUR

Behind the historic façades of the Alter Wall 2-32 ensemble, around 23,000 m² of modern office space and around 12,000 m² of high-quality retail space are to be created between Alsterfleet, City Hall, Rathausmarkt and the Chamber of Commerce.

EK2: Farris bridge

Larvik, Norway

Start of construction: September 2014

Construction volume (value of our services): 2,26 M EUR

Farris bridge pases in a horizontal curve around the Farris Lake, near Larvik in Vestfold. The bridge is a part of E18, and is a part of the new 7 km long stretch from Bommestad to Sky in Larvik. The bridge is a part of the new E18 in Vestfold, Norway.

New building Parking II Roche

Kaiseraugst, Switzerland

Start of construction: September 2014

Construction volume (value of our services): 12,1 M CHF

New construction of a parking garage with 9 parking decks, 2 access spirals and 4 staircases in in-situ concrete and elements

Spillepengen transport hub

Malmö, Sweden

Start of construction: September 2014

The 370 meter long bridge was concreted in three sections and post-tensioned by BBV Systems with internal tendons BBV L9 and BBV L19.

Schwabengarage, Stuttgart

Stuttgart, Germany

Start of construction: September 2014

The draft of the cathodic corrosion protection system with protective current (repair principle "K" according to RiLi of the DAfStB) is based on the specifications of the planning engineering office.