Map view

Semmering Base Tunnel SBT Lot 2.1

Steiermark, Austria

Start of construction: December 2013

Construction volume (value of our services): 623 M EUR

The planned Semmering Base Tunnel (SBT) is currently one of the most important large-scale infrastructure projects in the heart of Europe, and forms part of the new Austrian southern railway, a central axis on the trans-European route from the Baltic to the Adriatic. With an overall length of 27.3 km, the SBT links Lower Austria with Steiermark. Österreichische Bundesbahn [Austrian Railways] has appointed Implenia as part of a consortium with Swietelsky for the construction of central Lot 2.1, a section about 13 km in length.

[Translate to English:] Jugendherberge Saas Fee

Construction of new wellness hostel Aqua Allin

Saas-Fee, Switzerland

Start of construction: October 2013

Construction volume (value of our services): 1,2 M CHF

Four story wood building with a ventilated wood façade.

[Translate to English:] ROY - Aussenansicht

ROY

Winterthur, Switzerland

Start of construction: September 2013

Construction volume (value of our services): 6,3 M CHF

The Minergie-compliant ROY building was constructed on a former industrial area in Winterthur's trendy Neuheigi district.

Funicular railway Schwyz-Stoos

Schwyz, Switzerland

Start of construction: May 2013

Construction volume (value of our services): 25 M CHF

The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle service with 2 vehicles for passenger and goods transport. Both vehicles run on a common track between the termini with Abt's diversion in the middle of the line.

Energy Monitoring System EnMos - Swisscom

Zurich, Switzerland

Start of construction: September 2012

Construction volume (value of our services): 2,2 M CHF

Acting as the total contractor, Tetrag implemented an energy monitoring system for 67 data centres and hubs belonging to Swisscom. This included the concept development, planning, meter installation and system integration.

Zellweger Park

Uster, Switzerland

Start of construction: August 2012

Construction volume (value of our services): 1,5 M CHF

5000 m² of ventilated façade with wood cladding

[Translate to English:] Wohnüberbauung Neugrüen

"Neugrüen" residential complex

Mellingen, Switzerland

Start of construction: August 2012

Construction volume (value of our services): 13 M CHF

Multi-story wooden structures erected in prefabricated elements with a wood façade. The project meets Minergie P ECO standards.

Syngenta Project ROSE

Basel, Switzerland

Start of construction: June 2012

Construction volume (value of our services): 46 M CHF

New construction of the staff restaurant. Subsequently, the existing restaurant was demolished and converted into a piazza.

[Translate to English:] Elefantenpark

Elephant House, Zürich Zoo

Zurich, Switzerland

Start of construction: April 2012

Construction volume (value of our services): 12 M CHF

Our Elephant House covers over 5,000 square meters of the new 10,000 square meter Elephant paddock at the Zürich Zoo.

Park Tower high-rise building

Zug, Switzerland

Start of construction: January 2012

Construction volume (value of our services): 93 M CHF

Park Tower high-rise building

Zurich, Oerlikon train station expansion, tracks 7 and 8

Zurich, Switzerland

Start of construction: January 2012

Construction volume (value of our services): 10,9 M CHF

The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train tracks and a 150-metre-long retaining wall are being added to Oerlikon station. In addition to these expansions, modifications are also being made to the existing construction. The bridge over Schaffhauserstrasse is being renewed, while all pedestrian access routes and underpasses are being enlarged. New retail spaces in the underground commercial centre beneath the station are also being added.