Map view
Results: 27
[Translate to English:] Danish Crown Essen/Oldenburg

Danish Crown Essen (Oldenburg)

Essen (Oldenburg), Germany

Start of construction: December 2012

An existing refrigerated warehouse at the Danish Crown site in Essen (Oldenburg) was extended in order to double the available cooling space.

Emsland Frischgeflügel GmbH, Haren

Haren, Germany

Start of construction: December 2012

A chicken abattoir with portioning, processing and packaging lines, including office space and employee facilities, was constructed for the customer over a total surface area of 32,000 m².

[Translate to English:] Josef Schnabels GmbH & Co. KG, Georgsmarienhütte

Josef Schnabels GmbH & Co. KG, Georgsmarienhütte

Georgsmarienhütte, Germany

Start of construction: December 2012

Upgrading and new construction of a meat portioning plant, including a freezer warehouse, office space and employee facilities, with a total floor area of 5,500 m².

[Translate to English:] BackShop Halle Queis

BackShop Halle Queis

Queis, Germany

Start of construction: December 2012

Implenia's refrigerated warehouse construction team built a freezer logistics centre, including office space, employee facilities and a technical equipment building, for BackShop GmbH in the Halle/Queis district.

[Translate to English:] Eisenbahnüberführung

Hornboden railway overpass

Grenzach-Wyhlen, Germany

Start of construction: October 2012

Construction volume (value of our services): 2 M EUR

Construction of a new railway overpass at Hornboden in Grenzach-Wyhlen

Kaufland Biberach an der Riss

Biberach an der Riss, Germany

Start of construction: October 2012

In the run-up to the repair of the beams of the department store, a conventional repair of the exposed parking deck (10,500 m2) was already carried out.

New Thyssen Krupp Quarter 2. BA, Essen

Essen, Germany

Start of construction: October 2012

Construction volume (value of our services): 12,5 M EUR

As part of the expansion of the Essen site of ThyssenKrupp AG, the 2nd construction phase was realized by Implenia Hochbau. As a partner of the building construction colleagues, Implenia Fassadentechnik built the multifaceted and complex outer shell of the buildings.

Energy Monitoring System EnMos - Swisscom

Zurich, Switzerland

Start of construction: September 2012

Construction volume (value of our services): 2,2 M CHF

Acting as the total contractor, Tetrag implemented an energy monitoring system for 67 data centres and hubs belonging to Swisscom. This included the concept development, planning, meter installation and system integration.

TG "N6-Altes Haus", Mannheim

Mannheim, Germany

Start of construction: September 2012

The constant entry of de-icing salt in winter through the parked vehicles led to severe corrosion with pitting, especially in the area of ​​the upper frame reinforcement.

BASF office building on Pfalzgrafenstraße

Ludwigshafen, Germany

Start of construction: September 2012

Construction volume (value of our services): 80 M EUR

Office building with a multi-storey car park on the banks of the river Rhine in Ludwigshafen – developed, planned and constructed in record time.

Zellweger Park

Uster, Switzerland

Start of construction: August 2012

Construction volume (value of our services): 1,5 M CHF

5000 m² of ventilated façade with wood cladding

[Translate to English:] Wohnüberbauung Neugrüen

"Neugrüen" residential complex

Mellingen, Switzerland

Start of construction: August 2012

Construction volume (value of our services): 13 M CHF

Multi-story wooden structures erected in prefabricated elements with a wood façade. The project meets Minergie P ECO standards.

TG Prinzregentenplatz

München, Germany

Start of construction: July 2012

The static reserves of the corroded reinforcement were determined through intensive preliminary investigations by the expert planner, so that the repair principle "K" - cathodic corrosion protection - was selected.

Science centre

Heilbronn, Germany

Start of construction: July 2012

Construction volume (value of our services): 26,3 M EUR

Construction of a new conference centre with a clearly defined technical concept and optimised costs.

Syngenta Project ROSE

Basel, Switzerland

Start of construction: June 2012

Construction volume (value of our services): 46 M CHF

New construction of the staff restaurant. Subsequently, the existing restaurant was demolished and converted into a piazza.