Noise protection tunnel A7 Hamburg-Altona

Hamburg, Germany

Start of construction: April 2021

Construction volume (value of our services): 202,24 M CHF

Construction of a noise protection tunnel on the A7 motorway in Hamburg-Altona

Car park and tower at Kronenrain, Neuenburg am Rhein

Neuenburg am Rhein, Germany

Start of construction: January 2021

Construction volume (value of our services): 6 M EUR

Creation of a multi-storey car park with a public city balcony and a viewing tower connected by bridge

Firmensitz und Produktion AVL SET GmbH, Wangen im Allgäu

Wangen im Allgäu, Germany

Start of construction: January 2021

Construction volume (value of our services): 12,4 M EUR

Turnkey production headquarters and production of AVL SET GmbH

TELT, CO08 - Villard Clément

Lyon, France

Start of construction: January 2021

Construction volume (value of our services): 248 M EUR

Construction of the base tunnel from the Villard Clément portal attacks.

Noise protection walls Flörsheim am Main

Flörsheim am Main, Germany

Start of construction: December 2020

Construction volume (value of our services): 5,352 M EUR

Construction of noise protection walls in Flörsheim am Main

Hyparschale Magdeburg

Magdeburg, Germany

Start of construction: October 2020

Construction volume (value of our services): 1,7 M EUR

Reinforcement of the supporting and shell structure of the Hyparschale built in 1969 in Magdeburg using carbon concrete.

Renovation of two raw meal silos at the Karsdorf cement plant

Karsdorf, Germany

Start of construction: September 2020

Construction volume (value of our services): 3,413 M EUR

Implenia is renovating two 70-metre-high raw meal silos at the Karsdorf cement plant in Saxony-Anhalt on behalf of OPTERRA Zement GmbH.

Subway access structure Oberhafentunnel

Hamburg, Germany

Start of construction: August 2020

Construction volume (value of our services): 12,5 M EUR

Construction of a new subway access structure with connection to the station HafenCity University

Bridge reinforcement with carbon concrete at Kleinsaubernitz

Kleinsaubernitz, Germany

Start of construction: August 2020

Construction volume (value of our services): 128.000 EUR

As part of a pilot project, Implenia reinforced a road bridge with carbon concrete.

New LPME research building TU Kaiserslautern

Kaiserslautern, Germany

Start of construction: June 2020

Construction volume (value of our services): 4,58 M EUR

Construction of the LPME (Laboratory for Ultra-Precision and Micro-Engineering) research building of the Technical University of Kaiserslautern

Construction LasmAaZ - Nuclear power plant Krümmel

Geesthacht, Germany

Start of construction: June 2020

Construction volume (value of our services): 21,2 M EUR

Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.

Stadtbahn line U81, lot 2, shell construction of tunnel

Düsseldorf, Germany

Start of construction: May 2020

Construction volume (value of our services): 23 M EUR

Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction.

Stadtbahn line U81 in Düsseldorf, shell construction for elevated route

Düsseldorf, Germany

Start of construction: May 2020

Construction volume (value of our services): 22 M EUR

Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated foundation work and the construction of an arched steel bridge using the incremental launching method.

Further construction of the groundwater basin Ohu

Essenbach, Germany

Start of construction: April 2020

Construction volume (value of our services): 56 M EUR

Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).

380-kV-Kabeldiagonale, 50hertz

Berlin, Germany

Start of construction: August 2019

Construction volume (value of our services): 128 M EUR

Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts