New office building DSTRCT, Berlin

Berlin, Germany

Start of construction: December 2019

Construction volume (value of our services): 11 M EUR

Implenia Fassadentechnik can announce another major order with the DSTRCT project in Berlin. The new building in Berlin-Pankow, designed by architects Gewers & Pudewill, will be given a modern aluminium-glass façade by Implenia with a total value of over 11 million euros.

CERN - Galerie UA 53

Cessy, France

Start of construction: October 2019

Construction volume (value of our services): 280.000 EUR

All for science: CERN, the European Organisation for Nuclear Research (Conseil Européen pour la Recherche Nucléaire), is one of the largest and most renowned centres for basic physics research in the world. Here, researchers search for the fundamental laws of the universe. At CERN, the world's largest and most complex equipment is used to research the smallest components of matter: the elementary particles.

Refresh of “TORO 1” commercial building, Brown Boveristrasse 5

Zürich, Switzerland

Start of construction: August 2019

Construction volume (value of our services): 20 M CHF

The current main tenants have reduced their rental space. The vacant rental area measuring around 8,900 m², about 45% of the total rental area, is to be made available for rental to various users (multi-tenant) in future.

TAMI V

Ratingen, Germany

Start of construction: August 2019

Construction volume (value of our services): 14 M EUR

Sustainable office quarter with lots of greenery all around - Implenia is building the TAMI V office building in the Schwarzbach quarter in Ratingen.

380-kV-Kabeldiagonale, 50hertz

Berlin, Germany

Start of construction: August 2019

Construction volume (value of our services): 128 M EUR

Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts

New building of the Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: June 2019

Construction volume (value of our services): 47,6 M CHF

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

SBB four-track expansion – Liestal

Liestal, Switzerland

Start of construction: June 2019

Construction volume (value of our services): 114,7 M CHF

Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure.

SMS 2A - New double track railway Sandbukta-Moss-Såstad

Såstad, Dilling, Moss, Norway

Start of construction: June 2019

Construction volume (value of our services): 728 M CHF

The new double track railway Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and is one of the sections of the line towards Halden (the Østfold railway's western line).

Spitallamm dam – Grimsel

Grimsel, Switzerland

Start of construction: May 2019

Construction volume (value of our services): 98 M CHF

The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.

Laubenganghäuser

Mannheim, Germany

Start of construction: March 2019

Construction volume (value of our services): 12,9 M EUR

Implenia is building two more apartment blocks for a long-standing regular client as part of a conversion project.

New building fire station 3 Fraport

Frankfurt am Main, Germany

Start of construction: March 2019

Construction volume (value of our services): 5,8 M EUR

As part of the expansion of Frankfurt Airport, a new fire station is built with training and education centre. Implenia Fassadentechnik is responsible for the multifaceted outer shell of the buildings.

Waldquartier Friedenstal Bernau

Bernau, Germany

Start of construction: January 2019

Construction volume (value of our services): 30 M EUR

Stadtviertel statt Streitkräfte: Implenia baut ein naturnahes Stadtquartier für Berlin-Pendler in zwei Bauabschnitten.

2nd Niger River Bridge

zw. Anambra State und Delta State, Nigeria,

Start of construction: January 2019

The 2nd Niger River Bridge in southern Nigeria consists of a 1.6 km long prestressed concrete superstructure, which is built using the incremental launching method, cantilevered cantilever construction and on falsework.

Zuidelijke Ringweg, Groningen

Groningen, Netherlands

Start of construction: January 2019

The southern bypass of the Dutch city of Groningen is about twelve kilometers long. The contract for the expansion of the southern ring road was awarded to the consortium Combinatie Herepoort.

[Translate to English:] Flughafen Berlin-Brandenburg

Berlin Brandenburg Airport

Berlin-Schönefeld, Germany

Start of construction: May 2009

Construction volume (value of our services): 14,5 M EUR

On the basis of plans by gmp Generalplanungsgesellschaft mbH and JSK International Architekten und Ingenieure mbH, Façade Technology constructed some 100,000 square metres of façade surface at the passenger terminal.