Extension of Métro Ligne 11, Lot GC01, Rosny-sous-Bois, Paris

Paris, France

Start of construction: December 2015

Construction volume (value of our services): 267 M EUR

The “Grand Paris Express” project aims to improve links between the French capital and the neighboring residential areas in the Greater Paris region (Île-de-France) by building a transport network of six driverless underground railway lines by 2030. The project will require 210 km of tunnel and nearly 70 new underground stations. It also comprises the extension of the existing line 11 from the station “Mairie des Lilas” in direction to “Rosny Bois-Perrier” in the east of Paris realized in three phases (GC01, GC02 and the viaduct).

SGP – Ligne 15 sud, Lot T2C

Noisy-Champs, France

Start of construction: December 2015

Construction volume (value of our services): 365 M EUR

The Grand Paris Express project aims to better connect the French capital and neighbouring residential areas in the Paris region by building a six-line driverless metro system by 2030. The project will require 210 kilometres of tunnels and almost 70 new metro stations. After winning "Lot GC01", Implenia was also awarded the contract for the extension of metro line 15 to the south-east of Paris ("Lot T2C") as part of a consortium.

[Translate to English:] Tagesansicht Gesamtprojekt

Schwabinger Tor, Munich

Munich, Germany

Start of construction: June 2015

Construction volume (value of our services): 3,8 M EUR

The "Schwabinger Tor" project, situated between Leopoldstraße and Berliner Straße, will be a large residential, office, gastronomy and hotel complex – a city within the city.

SBB Bözberg tunnel

Strihen, Switzerland

Start of construction: May 2015

Construction volume (value of our services): 145 M CHF

The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project.

[Translate to English:] Flughafen Berlin-Brandenburg

Berlin Brandenburg Airport

Berlin-Schönefeld, Germany

Start of construction: May 2009

Construction volume (value of our services): 14,5 M EUR

On the basis of plans by gmp Generalplanungsgesellschaft mbH and JSK International Architekten und Ingenieure mbH, Façade Technology constructed some 100,000 square metres of façade surface at the passenger terminal.

Construction of the new Rotweg school building

Wädenswil, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 850.000 CHF

In parts four stories high, the project is situated atop a public parking garage.

Cable Gallery

Lausanne, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 11,5 M CHF

As part of the preparatory work for the Lausanne train station construction site, all the cables managing the region's rail activity had to be diverted. To do this, we have excavated and sealed two wells 27.00 and 22.00 deep, for the introduction of a micro tunnel machine with an external radius of 3.00 m, which will has drilled a 625 m long tunnel under the Lausanne train station. We also built 2 covered trenches to connect the existing networks to the cable gallery.

[Translate to English:] Schulhaus Oberfeld - Aussenansicht

Oberfeld school building

Root, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 12 M CHF

Between 2016 and 2018, the premises were extended with the addition of a new school wing including a nursery, a daycare facility, a staff room and a classroom.

[Translate to English:] Bodensanierung Bau 7.1

Floor renovation in Building 7.1 – normal warehouse

Wuppertal, Germany

Start of construction: December 2015

Construction volume (value of our services): 125.000 EUR

Implenia Tesch GmbH renovated the industrial flooring in Building 7.1 of the Schaeffler Technologies AG & Co. KG site in Wuppertal.

Marieninsel excavation pit, Frankfurt am Main

Frankfurt am Main, Germany

Start of construction: December 2015

Construction volume (value of our services): 11,61 M EUR

Between November 2015 and November 2016, the joint venture Implenia Spezialtiefbau GmbH / Robert Zeller GmbH & Co.KG constructed the Marieninsel excavation pit. The dewatering was shut down in June 2017. The project is located on the edge of Frankfurt's banking district and comprises the two sub-projects Marienforum and Marienturm. The client of the project is Pecan Development GmbH. The Marienforum is an approximately 40m high, flat-founded building. In addition to office space, the building will house 2 restaurants.

BW 07, Ilm valley bridge near Stadtilm

Stadtilm, Germany

Start of construction: November 2015

In the course of the new line B 90n, the structure at Stadtilm crosses the Ilmaue and the B 87n.

[Translate to English:] Neubausiedlung sue&til - Aussenansicht

sue&til (building services)

Winterthur, Switzerland

Start of construction: November 2015

Construction volume (value of our services): 18 M CHF

In the "Neuhegi" district of Oberwinterthur, more than 300 new apartments for rental and ownership are being built using wooden construction methods. The ground floor will also contain public areas filled with commercial spaces.

VDE 8.1 Breitengüßbach - Zapfendorf

Breitengüßbach, Germany

Start of construction: October 2015

Construction volume (value of our services): 18,126 M EUR

As part of the German Unity Transport Project No. 8 ( VDE.8 ), Implenia Speialtiefbau GmbH was awarded the contract for the planning and execution of the entire special civil engineering works for the construction section PFA 23/24 in May 2015.

Conversion of residential and commercial building at Walter-Kolb-Straße 13

Frankfurt, Germany

Start of construction: September 2015

Construction volume (value of our services): 23,9 M EUR

Implenia converts 1980s office buildings in Frankfurt into modern living spaces: the eleven-storey office building in Frankfurt’s Sachsenhausen district now offers the best of contemporary living.

UCP Tax Office Mannheim

Mannheim, Germany

Start of construction: September 2015

The underground car park is located in the basement of the building and has two congruent levels.