Map view
[Translate to English:] Neubau Haus 3

Construction of the ‘Haus 3’ building

Saarbrücken, Germany

Start of construction: July 2016

Construction volume (value of our services): 6 M EUR

The German University of Prevention and Health Management (Deutsche Hochschule für Prävention und Gesundheitsmanagement, DHfPG) extended its site at the state sports academy of Saarland by a further building, ‘Haus 3’. This was integrated into the existing complex of the sports academy in conjunction with the ‘Haus 2’ building.

AZ Rohwiesen

Opfikon, Switzerland

Start of construction: August 2019

Construction volume (value of our services): 16 M CHF

The Zurich blue-light organizations are guided by the credo "knowing heads in crisis".

Servicebuilding Preola

Zürich, Switzerland

Start of construction: September 2018

Construction volume (value of our services): 11,9 M CHF

In Zurich Altstetten, "West-Log" is a property for city logistics.

WÜB WolkenWerk

Oerlikon, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 30 M CHF

Implenia is constructing the three high-rise residential buildings and associated plinth structures in the up-and-coming Zurich-Oerlikon district.

Overbuilding Rebgarten, Liestal

Liestal, Switzerland

Start of construction: November 2017

Construction volume (value of our services): 6,8 M CHF

Residential and commercial building, divided into two continuous basement levels with three structures on top.

Bassbelt residential complex

Pieterlen, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 23,3 M CHF

New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved walkways, a playground and carports (36 cars).

Haus Adeline Favre (Hall 52)

Winterthur, Switzerland

Start of construction: December 2016

Construction volume (value of our services): 69 M CHF

In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new construction of replacement property.

Construction of new swimming pool and sports hall on Sursee campus

Oberkirch, Switzerland

Start of construction: October 2016

Construction volume (value of our services): 43,7 M CHF

Construction of new swimming pool and sports hall on Sursee campus

Andreasturm

Zurich, Switzerland

Start of construction: April 2016

Construction volume (value of our services): 100 M CHF

SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main tracks in the north-eastern section of the train station and the Amstein-Walthert building.

[Translate to English:] Produktionsgebäude 5 - St. Wendel

Production building 5

St. Wendel, Germany

Start of construction: May 2015

Construction volume (value of our services): 7,943 M EUR

Production building 5 was connected directly to the central transport route to the high-bay warehouse.

[Translate to English:] Neubau einer Werk-, Lager- und Logistikhalle mit Verwaltungsgebäude

Construction of a workshop, warehouse and logistics hall with office building

Saarbrücken, Germany

Start of construction: November 2014

Construction volume (value of our services): 21,6 M EUR

Turnkey construction for GIU

Munich University of Applied Sciences

Munich, Germany

Start of construction: August 2010

Construction volume (value of our services): 16 M EUR

Turnkey construction of an extension to the Munich University of Applied Sciences.

[Translate to English:] Neubau des Geschäftsgebäudes „Viktoriaeck“

New construction of the ‘Viktoriaeck’ commercial building

Saarbrücken, Germany

Start of construction: June 2008

Construction volume (value of our services): 12,5 M EUR

The ‘Viktoriaeck commercial building’ project has a prime location directly in the centre of Saarbrücken.