Map view
Filter: 2007
Results: 18
[Translate to English:] Schiffshebewerk Niederfinow

Ship lift, Niederfinow

Niederfinow, Germany

Start of construction: December 2007

Construction volume (value of our services): 89 M EUR

Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal

Wehrhahn Line, Lot 1

Düsseldorf, Germany

Start of construction: July 2007

The state capital Düsseldorf is realizing the so-called core section of the Wehrhahn Line as an underground tram route to improve local public transport. With the new double-track tunnel route, which is a replacement for 5 above-ground tram lines, a sustainable increase in the attractiveness of local public transport as well as the possibility of urban planning and other traffic-related improvements in the route area will be achieved.

Nant de Drance pumped-storage power station

Finhaut, Valais (Le Châtelard), Switzerland

Start of construction: December 2007

Construction volume (value of our services): 742 M CHF

Construction of an underground pumped-storage power station.

Northern Links 12 and 22

Stockholm, Sweden

Start of construction: December 2007

Construction volume (value of our services): 165 M EUR

The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.

Main bridge Randersacker

Würzburg-Randersacker, Germany

Start of construction: November 2007

The Main Bridge Randersacker spans the Main, a railway line, federal highway 13 and two state roads with a length of 540 m.

Botniabanan

Kramfors and Umea, Sweden

Start of construction: October 2007

The bridges were longitudinally prestressed with BBV tendons of various sizes.

MAN plant development

Munich, Germany

Start of construction: September 2007

Construction volume (value of our services): 24,3 M EUR

MAN eastern plant development – made-to-measure architectural work

Bürgerspital nursing home

Wachenheim, Germany

Start of construction: August 2007

Construction volume (value of our services): 5,28 M EUR

The historical art nouveau villa of the Bürgerspital nursing home was given a partial overhaul and a major extension to create a high-class complex within a well-maintained park.

REpower production and assembly hall

Bremerhaven, Germany

Start of construction: July 2007

Construction volume (value of our services): 15,23 M EUR

Construction and consultancy expertise for classic industrial construction: an optimised concept for a production hall where eco-friendly wind turbines are built.

Reilshof

Halle, Germany

Start of construction: July 2007

Construction volume (value of our services): 10,5 M EUR

Careful restoration in keeping with the historical aesthetic, with a special focus on economic and energy sustainability.

Dachser logistics centre

Hof, Germany

Start of construction: June 2007

Construction volume (value of our services): 21,9 M EUR

The new logistics centre in Hof comprises two handling warehouses, two high-bay warehouses, a three-storey office building and extensive outdoor facilities.

Chemnitz Justice Centre

Chemnitz, Germany

Start of construction: May 2007

Construction volume (value of our services): 22,7 M EUR

Saxony’s first PPP project: The award-winning Chemnitz Justice Centre has enabled the State of Saxony to save some 14 per cent of the overall costs.

[Translate to English:] Flughafen Plaza Hamburg

Airport Plaza, Hamburg

Hamburg, Germany

Start of construction: March 2007

Construction volume (value of our services): 9 M EUR

Designed by the Hamburg-based architecture firm Gerkan, Marg & Partners, the Airport Plaza is the newest of the three terminal buildings. It was opened in December 2008 and is situated between the two other terminals, providing a transition between them.

[Translate to English:] Stadtwerke Essen - Rohrleitungsbau

Essen municipal utilities – pipeline construction

Essen, Germany

Start of construction: January 2007

Framework agreement for gas and water pipelines – installation of multiple pipelines in public roads.

[Translate to English:] Stadtwerke Essen - Kanalbau

Essen municipal utilities – pipe construction

Essen, Germany

Start of construction: January 2007

Replacement of a mixed water pipe DN 800 to DN 1,000 – wastewater dewatering during construction.