S21 Berlin

Berlin, Germany

Start of construction: December 2011

Construction volume (value of our services): 75 M EUR

A new north-south suburban railway line for Berlin. In its first expansion phase, the line will connect the Westhafen and Wedding stations inside Berlin’s inner ring road with the main railway station.

[Translate to English:] U5 Berlin

U5, Berlin

Berlin, Germany

Start of construction: December 2011

Construction volume (value of our services): 159 M EUR

Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin

[Translate to English:] Schiffshebewerk Niederfinow

Ship lift, Niederfinow

Niederfinow, Germany

Start of construction: December 2007

Construction volume (value of our services): 89 M EUR

Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal

Wehrhahn Line, Lot 1

Düsseldorf, Germany

Start of construction: July 2007

The state capital Düsseldorf is realizing the so-called core section of the Wehrhahn Line as an underground tram route to improve local public transport. With the new double-track tunnel route, which is a replacement for 5 above-ground tram lines, a sustainable increase in the attractiveness of local public transport as well as the possibility of urban planning and other traffic-related improvements in the route area will be achieved.

Flach, Büttelborn

Büttelborn, Germany

Start of construction: December 2011

Construction of a new logistics warehouse with cold store and freezer store, as well as provisioning areas.

[Translate to English:] Vega Salmon GmbH, Handewitt

Vega Salmon GmbH, Handewitt

Handewitt, Germany

Start of construction: December 2011

Implenia's refrigerated warehouse construction team built a new fish processing plant at the Handewitt site of Vega Salmon GmbH. Here, salmon is smoked, processed and packed ready for shipping in an area covering 9,500 m².

[Translate to English:] Celler Land Frischgeflügel GmbH, Wietze

Celler Land Frischgeflügel GmbH, Wietze

Wietze, Germany

Start of construction: December 2011

A chicken abattoir with portioning, processing and packaging lines, including office space and employee facilities, was constructed for the customer over a total surface area of 23,000 m².

Pinchat Tunnel, lot 23.12, CEVA, Geneva

Geneva, Switzerland

Start of construction: December 2011

Construction volume (value of our services): 134,02 M CHF

Construction of a two-track railway tunnel using boring machines in loose ground.

[Translate to English:] Erhaltungs- und Interventionszentrum (EIZ) Erstfeld

Maintenance and intervention centre (MIC) in Erstfeld

Erstfeld, Switzerland

Start of construction: November 2011

Construction volume (value of our services): 12 M CHF

At each end of the new Gotthard Base Tunnel in Erstfeld and Biasca, SBB has commissioned the construction of two identical maintenance and intervention centres (MICs). The Erstfeld MIC was executed by Implenia acting as the total contractor.

Power Systems Headquarters

Oberhausen, Germany

Start of construction: October 2011

Construction volume (value of our services): 32 M EUR

The headquarters of Bilfinger Power Systems is the first private construction project to be executed on the basis of a life-cycle offer.

[Translate to English:] Leibniz-Gymnasium

Leibniz high school

St. Ingbert, Germany

Start of construction: September 2011

Construction volume (value of our services): 3,5 M EUR

On behalf of the District of Saarpfalz, Implenia Modernbau constructed a new school building and gym at Leibniz high school in St. Ingbert.

[Translate to English:] Bocksbachtalbrücke

Bocksbachtal Bridge

Karlsbad, Germany

Start of construction: July 2011

Construction volume (value of our services): 11,5 M EUR

Construction of the new Bocksbachtal Bridge and a rainwater retention basin

Arsta Bridge

Stockholm, Sweden

Start of construction: May 2011

The “Citybanan” project in the heart of Stockholm includes several tunnel construction projects (including the Söderström tunnel, which was pre-tensioned by BBV), as well as bridge structures over busy train routes and motorways.

Bridge E221

Pęcławice, Poland

Start of construction: April 2011

The E221 project is located in Pęcławice in Poland. The bridge consists of two adjacent superstructures.

Bulow Carre

Stuttgart, Germany

Start of construction: April 2011

Construction of an office and administration building in Stuttgart.