Map view
Results: 84
[Translate to English:] Villa Boveri

Villa Boveri

Baden, Switzerland

Start of construction: July 2015

Construction volume (value of our services): 310.000 CHF

Preservation work on the historic, 125 year old Villa along with the extension of the top floor staff rooms and installation of a dampening mass in the conference rooms.

Photovoltaic system – Riverside

Zuchwil, Switzerland

Start of construction: July 2015

Construction volume (value of our services): 100.000 CHF

On the Riverside plot in Zuchwil, Tetrag implemented a system solution for energy management and monitoring for one of the largest retrofitted photovoltaic installations in Switzerland.

[Translate to English:] Neubau Rohsalzspeicher

Construction of a new crude salt storage facility

Rheinberg, Germany

Start of construction: June 2015

Construction volume (value of our services): 1,25 M EUR

Implenia Tesch GmbH constructs a new crude salt storage facility for esco in Rheinberg.

[Translate to English:] Telekom Hamburg

Deutsche Telekom, Hamburg

Hamburg, Germany

Start of construction: June 2015

Construction volume (value of our services): 10,1 M EUR

The Deutsche Telekom office building on Überseering in Hamburg was built according to plans by the architecture firm KSP Jürgen Engel Architekten

[Translate to English:] Eurotower

Eurotower

Frankfurt, Germany

Start of construction: February 2015

Construction volume (value of our services): 3,8 M EUR

The Eurotower was converted and modernised in 2015 on the basis of plans by CHM Tower Architekten GmbH. With a usable area of 35,000 square metres spread over 38 floors, the former office tower of the European Central Bank in Frankfurt was completely overhauled.

[Translate to English:] Chefs Culinar Nord, Hamburg

Chefs Culinar Nord, Hamburg

Hamburg, Germany

Start of construction: December 2014

During the expansion of the Hamburg site, a particular focus was placed on energy-efficient construction methods.

[Translate to English:] ETH HWW Living Science

ETH HWW Living Science

Zurich, Switzerland

Start of construction: December 2014

Construction volume (value of our services): 2,26 M CHF

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

EK2: Farris bridge

Larvik, Norway

Start of construction: September 2014

Construction volume (value of our services): 2,26 M EUR

Farris bridge pases in a horizontal curve around the Farris Lake, near Larvik in Vestfold. The bridge is a part of E18, and is a part of the new 7 km long stretch from Bommestad to Sky in Larvik. The bridge is a part of the new E18 in Vestfold, Norway.

[Translate to English:] Erweiterung Testanlage für Brandschutzglas

Expansion of testing facility for fire safety glass

Gelsenkirchen, Germany

Start of construction: August 2014

Construction volume (value of our services): 500.000 EUR

Expansion of the fire safety glass testing facility of the NS Group, Pilkington Gelsenkirchen plant.

[Translate to English:] Elbchaussee 139a

Elbchaussee 139a

Hamburg, Germany

Start of construction: February 2014

Construction volume (value of our services): 1,3 M EUR

According to the plans of the architects gmp von Gerkan, Marg und Partner, the residential building with the curved facades was built in 2014 on Hamburg's noble Elbchaussee.

[Translate to English:] Sanierung Wascherbühne in Bottrop

Renovation of washing platform in Bottrop

Bottrop, Germany

Start of construction: February 2014

Construction volume (value of our services): 900.000 EUR

Implenia Tesch GmbH renovated the washing platform belonging to ArcelorMittal GmbH in Bottrop.

Bayernland eG, Regensburg

Regensburg, Germany

Start of construction: December 2013

Construction of façade, floor insulation, electric heating for frost protection, doors and gates, roof cladding and sealing, smoke and heat extraction, lightning protection and stair tower

[Translate to English:] Jugendherberge Saas Fee

Construction of new wellness hostel Aqua Allin

Saas-Fee, Switzerland

Start of construction: October 2013

Construction volume (value of our services): 1,2 M CHF

Four story wood building with a ventilated wood façade.

[Translate to English:] Umbau Schaeffler Casino

Conversion of Schaeffler cafeteria

Wuppertal, Germany

Start of construction: September 2013

Construction volume (value of our services): 300.000 EUR

Implenia Tesch converted the cafeteria of Schaeffler GmbH & Co. KG during ongoing operations.

KUKA Entwicklungs- und Technologiezentrum

Augsburg, Germany

Start of construction: May 2013

Construction volume (value of our services): 56,45 M EUR

This project is an example of a cooperative partnership with the building owner. The planning and construction of the property were optimised in a joint process that focused on the overall costs and the operation of the building.