Map view
Filter: 2006
Results: 12

Wehrhahn line, lot 1

City of Düsseldorf, Germany

Start of construction: December 2006

Construction volume (value of our services): 455 M EUR

In order to improve the local public transportation system, the state capital of Duesseldorf has made the decision to expand the so-called core section of the Wehrhahn Line as an underground city railway line, replacing 5 aboveground streetcar lines. The new double-track tunnel section enhances the sustainable attractiveness of the local public transportation system and maintains the ability of improvements in urban development and miscellaneous traffic engineering in rail and track construction.

[Translate to English:] Lärmschutzeinhäusung A1 Köln-Lövenich

Noise control enclosure A1 Cologne-Lövenich

Cologne-Lövenich, Germany

Start of construction: December 2006

Construction volume (value of our services): 140 M EUR

Construction of a noise control enclosure including control and safety technology, plus maintenance for ten years

Weinberg Tunnel, SBB Zurich cross-city link ATW

Zurich, Switzerland

Start of construction: December 2006

Construction volume (value of our services): 353,6 M CHF

Construction of a two-track railway tunnel with a TBM.

Lufthansa training and conference centre

Seeheim-Jugenheim, Germany

Start of construction: November 2006

Construction volume (value of our services): 100 M EUR

The training centre constructed for Lufthansa in Seeheim, which includes a 483-room conference hotel, is one of the largest in Germany.

[Translate to English:] Loop5 Shoppingcenter, Weiterstadt

LOOP5 shopping centre, Weiterstadt

Weiterstadt, Germany

Start of construction: November 2006

Construction volume (value of our services): 5,1 M EUR

LOOP5 is a large shopping centre in Weiterstadt, a town in southern Hesse. It was constructed on the basis of plans by the Düsseldorf architecture office HPP-International. Façade Technology was responsible for constructing the façades and commercial spaces.

Limbecker Platz

Essen, Germany

Start of construction: October 2006

Construction volume (value of our services): 150 M EUR

One of the largest inner-city shopping centres in Germany with a certified sustainability concept.

Duisburg Forum

Duisburg, Germany

Start of construction: September 2006

Construction volume (value of our services): 99,1 M EUR

Construction of a multi-award-winning inner-city shopping centre in Duisburg.

Saale-Elster valley bridge

Halle, Germany

Start of construction: May 2006

With a total length of around 8,600 m, the new DB line is the longest bridge structure in Germany.

[Translate to English:] Alexa - Shopping- und Freizeitcenter

ALEXA shopping and leisure centre

Berlin, Germany

Start of construction: May 2006

Construction volume (value of our services): 4,5 M EUR

The ALEXA shopping and leisure centre on the Alexanderplatz in Berlin was constructed in 2007 according to plans by Portuguese architect José M. Quintela da Fonseca. It was designed to be a light and airy Art Deco style building with a unique ambience and the distinctive flair of the 1920s.

[Translate to English:] BKK Mobil Oil Hühnerposten

BKK Mobil Oil Hühnerposten

Hamburg, Germany

Start of construction: May 2006

Construction volume (value of our services): 3 M EUR

The Neuer Hühnerposten underwent redevelopment starting in 2006, with a series of office and hotel buildings being constructed. These include the eight-storey office building for the company health insurance fund of Mobil Oil.

Golden Ears Bridge

Vancouver, Canada

Start of construction: April 2006

The Golden Ears Bridge is a newly built 6-lane cable-stayed bridge over the Fraser River and connects the districts of Langley and Surrey in the south with Maple Ridge and Pitt Meadow in the north of Vancouver, British Colombia.

[Translate to English:] Vallourec & Mannesmann

Vallourec & Mannesmann

Düsseldorf, Germany

Start of construction: January 2006

Construction volume (value of our services): 1,2 M EUR

Construction work in groundwater approx. 1 m deep – working around the clock during production downtime