Citybanan Project Odenplan and Vasatunnel

Stockholm, Sweden

Start of construction: December 2008

Construction volume (value of our services): 147 M EUR

The Citybanan connects the northern and the southern part of Stockholm subterranean with two additional rail tracks and doubles the capacity of the rail connection which exists since 1871. The wider area of Stockholm increases by 20.000 inhabitants every year. To offset the estimated traffic volume, the project Citybanan was realized.

[Translate to English:] European XFEL

European XFEL project

Hamburg, Germany

Start of construction: December 2008

Construction volume (value of our services): 206 M EUR

The European XFEL (X-Ray Free Electron Laser) project brings a new research facility to Hamburg.

Under Elmene & Leifsgade

Kopenhagen, Denmark

Start of construction: October 2008

In Copenhagen, waterproof construction pits were created in the street area in the immediate vicinity of residential buildings for the new construction of the underground car parks “Under Elmene” and “Leifsgade”.

Metris

Munich, Germany

Start of construction: September 2008

Construction volume (value of our services): 59 M EUR

Optimum usage of space and high energy-efficiency standards for the building complex in Munich's Arnulfpark.

Waldhof retirement home

Mannheim, Germany

Start of construction: August 2008

Construction volume (value of our services): 7,61 M EUR

The new construction in the Waldhof-Ost district of Mannheim offers a high standard of living for the elderly.

Student residence INF 681

Heidelberg, Germany

Start of construction: July 2008

Construction volume (value of our services): 6,15 M EUR

Student living on the Neckar River in terraced three- to four-storey buildings.

[Translate to English:] Neubau des Geschäftsgebäudes „Viktoriaeck“

New construction of the ‘Viktoriaeck’ commercial building

Saarbrücken, Germany

Start of construction: June 2008

Construction volume (value of our services): 12,5 M EUR

The ‘Viktoriaeck commercial building’ project has a prime location directly in the centre of Saarbrücken.

Zurich cross-city link, lot 2, Löwenstrasse train station

Zurich, Switzerland

Start of construction: May 2008

Construction volume (value of our services): 33,8 M CHF

The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for everyone involved.

Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft

Zurich, Switzerland

Start of construction: May 2008

Construction volume (value of our services): 11,4 M CHF

For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern section and as the target excavation pit for the tunnel boring machine in the Weinberg Tunnel.

MAN Forum

Munich, Germany

Start of construction: April 2008

Construction volume (value of our services): 18,4 M EUR

A cooperative partnership for long-term success: new construction of the customer and delivery centre for MAN trucks in the striking corporate architecture.

ThyssenKrupp Group Headquarters

Essen, Germany

Start of construction: March 2008

Construction volume (value of our services): 19,3 M EUR

A challenging building shell construction delivered on schedule

"KOMM"

Offenbach, Germany

Start of construction: March 2008

The construction pit enclosure of the construction pit "KOMM".

MAN Truck & Bus Centre

Augsburg, Germany

Start of construction: February 2008

Construction volume (value of our services): 6,3 M EUR

An ultra-modern mobility hub for trucks, buses and Volkswagen utility vehicles was built as a turnkey project for MAN in Augsburg in just seven months.

[Translate to English:] Krefeld

Krefeld – civil works

Krefeld, Germany

Start of construction: January 2008

Construction volume (value of our services): 460.000 EUR

Construction period of just 10 weeks for approx. 180 m of roadway including complete road construction.

[Translate to English:] Mülheim an der Ruhr

Mülheim an der Ruhr

Mülheim an der Ruhr, Germany

Start of construction: January 2008

Construction volume (value of our services): 500.000 EUR

Foundation works for cold plate leveller – working during ongoing production.