Humboldt Forum in the Berlin Palace, Berlin

Berlin, Germany

Start of construction: December 2013

Construction volume (value of our services): 20 M EUR

The reconstruction of the Berlin Palace, now the Humboldt Forum in the Berlin Palace, diagonally opposite the Berlin Cathedral, is financed by the main state funding and by donations.

[Translate to English:] Ansicht Süd West Fassade

Humboldt Forum at Berlin Palace, Berlin, BCL

Berlin, Germany

Start of construction: February 2013

Situated diagonally opposite Berlin Cathedral, Berlin Palace – now the home of the Humboldt Forum – is undergoing reconstruction financed by the government and by donations.

Nationwide energy management system – Coop

Basel, Switzerland

Start of construction: January 1999

Construction volume (value of our services): 15 M CHF

Tetrag is building a nationwide energy management system for Coop that will encompass more than 800 sales points and distribution centres. This includes a central server infrastructure for aggregating data to obtain daily, monthly and yearly values. Key figures will also be calculated on an ongoing basis and compared to limit values.

Bayernland eG, Regensburg

Regensburg, Germany

Start of construction: December 2013

Construction of façade, floor insulation, electric heating for frost protection, doors and gates, roof cladding and sealing, smoke and heat extraction, lightning protection and stair tower

[Translate to English:] Jugendherberge Saas Fee

Construction of new wellness hostel Aqua Allin

Saas-Fee, Switzerland

Start of construction: October 2013

Construction volume (value of our services): 1,2 M CHF

Four story wood building with a ventilated wood façade.

Dantestrasse

Wiesbaden, Germany

Start of construction: September 2013

Construction volume (value of our services): 19,29 M EUR

Urban district with high-quality open space constructed between the main train station and the Kurhaus convention centre for the municipal housing company GWW.

[Translate to English:] ROY - Aussenansicht

ROY

Winterthur, Switzerland

Start of construction: September 2013

Construction volume (value of our services): 6,3 M CHF

The Minergie-compliant ROY building was constructed on a former industrial area in Winterthur's trendy Neuheigi district.

[Translate to English:] Umbau Schaeffler Casino

Conversion of Schaeffler cafeteria

Wuppertal, Germany

Start of construction: September 2013

Construction volume (value of our services): 300.000 EUR

Implenia Tesch converted the cafeteria of Schaeffler GmbH & Co. KG during ongoing operations.

HumboldthafenEins

Berlin, Germany

Start of construction: July 2013

Construction volume (value of our services): 63,93 M EUR

At Berlin’s main railway station, the first DGNB platinum-certified property and the office building with the highest points score in Germany were constructed as a turnkey project.

Bethanien-Höfe residential development

Hamburg, Germany

Start of construction: July 2013

Construction volume (value of our services): 25,6 M EUR

A high-quality residential complex for the elderly with care facilities and community living spaces, constructed as a turnkey project.

Altstadtringtunnel Munich

München, Germany

Start of construction: July 2013

In the course of preliminary investigations for a planned repair of the Altstadtring Tunnel, the material properties of the built-in prestressing steel should be determined.

Funicular railway Schwyz-Stoos

Schwyz, Switzerland

Start of construction: May 2013

Construction volume (value of our services): 25 M CHF

The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle service with 2 vehicles for passenger and goods transport. Both vehicles run on a common track between the termini with Abt's diversion in the middle of the line.

KUKA Entwicklungs- und Technologiezentrum

Augsburg, Germany

Start of construction: May 2013

Construction volume (value of our services): 56,45 M EUR

This project is an example of a cooperative partnership with the building owner. The planning and construction of the property were optimised in a joint process that focused on the overall costs and the operation of the building.

Sugar silo Uelzen

Uelzen, Germany

Start of construction: May 2013

Prestressing of the concrete container with a height of approx. 60 m and a diameter of approx. 46 m.

UCP Kaufland Möhringen

Möhringen, Germany

Start of construction: May 2013

In the underground car park, considerable pollution was found in some cases, particularly in the crack area in the ceiling above the 2nd basement level.