Map view

Nationwide energy management system – Coop

Basel, Switzerland

Start of construction: January 1999

Construction volume (value of our services): 15 M CHF

Tetrag is building a nationwide energy management system for Coop that will encompass more than 800 sales points and distribution centres. This includes a central server infrastructure for aggregating data to obtain daily, monthly and yearly values. Key figures will also be calculated on an ongoing basis and compared to limit values.

[Translate to English:] Jugendherberge Saas Fee

Construction of new wellness hostel Aqua Allin

Saas-Fee, Switzerland

Start of construction: October 2013

Construction volume (value of our services): 1,2 M CHF

Four story wood building with a ventilated wood façade.

[Translate to English:] ROY - Aussenansicht

ROY

Winterthur, Switzerland

Start of construction: September 2013

Construction volume (value of our services): 6,3 M CHF

The Minergie-compliant ROY building was constructed on a former industrial area in Winterthur's trendy Neuheigi district.

Funicular railway Schwyz-Stoos

Schwyz, Switzerland

Start of construction: May 2013

Construction volume (value of our services): 25 M CHF

The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle service with 2 vehicles for passenger and goods transport. Both vehicles run on a common track between the termini with Abt's diversion in the middle of the line.

Tresfjord Bridge

Vestnes, Norway

Start of construction: January 2013

The Tresfjord Bridge with a length of 1,290 meters is part of the approximately 20 km long extension of the E 136 motorway between Åndalsnes and Ålesund.