Map view
[Translate to English:] Pieterlen Bassbelt, Biel

Pieterlen Bassbelt

Biel/Bienne, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 1,81 M CHF

Spring 2019 saw the completion of the new, timber-clad Bassbelt superstructure between Bassbeltweg and Solothurnerstrasse in Pieterlen.

[Translate to English:] Quai Zürich

Quai Zurich

Zurich, Switzerland

Start of construction: April 2017

The Quai Zurich project involves the redevelopment of the global headquarters of the Zurich Insurance Group. Bringing together heritage properties full of tradition and state-of-the-art construction, the project reflects the evolving nature of our company.

Sinergia

Chur, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 69 M CHF

Office building with open-plan layout. Merging of 14 departments.

[Translate to English:] Giessenturm - Aussenansicht

Giessenturm (specialist planning)

Dübendorf, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 90 M CHF

In the north west of Dübendorf, between the rural road and the idyllic path along the bank of the River Glatt, a new urban district is being built in five stages on the former Givaudan site, with completion scheduled for 2022.

Nationwide energy management system – Coop

Basel, Switzerland

Start of construction: January 1999

Construction volume (value of our services): 15 M CHF

Tetrag is building a nationwide energy management system for Coop that will encompass more than 800 sales points and distribution centres. This includes a central server infrastructure for aggregating data to obtain daily, monthly and yearly values. Key figures will also be calculated on an ongoing basis and compared to limit values.

Overbuilding Rebgarten, Liestal

Liestal, Switzerland

Start of construction: November 2017

Construction volume (value of our services): 6,8 M CHF

Residential and commercial building, divided into two continuous basement levels with three structures on top.

[Translate to English:] Zürich Flughafen SwissLounge

SwissLounge at the airport

Zurich airport, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 350.000 CHF

Implenia Holzbau helped produce and install the new SwissLounge at the Zürich Airport with a close partnership between our wood construction and our finish carpentry teams.

Vogelsang Wetzikon – Mönchberg- /Preyen- /Tösstalstrasse

Wetzikon, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 62 M CHF

The modernisation of the area comprises three stages with 12 existing residential buildings. The majority of the properties are Göhner buildings which are being enlarged to meet contemporary living requirements, including the addition of a new storey.

Renovation Überlandstrasse 375/377 und 391/393

Zürich, Switzerland

Start of construction: August 2017

Construction volume (value of our services): 20 M CHF

The two apartment buildings from the 1960s with a total of 180 apartments are in great need of renovation and refurbishment.

Interior renovation Postmatte 1/3/5 and Zellburg 2/3/4

Schenkon, Switzerland

Start of construction: March 2017

Construction volume (value of our services): 6,4 M CHF

The scope of the renovation of these six residential buildings with a total of 68 flats comprised the bathroom units, kitchens, lift systems and parts of the external works. In addition, contaminants were removed from the areas requiring renovation.

Bassbelt residential complex

Pieterlen, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 23,3 M CHF

New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved walkways, a playground and carports (36 cars).