Map view

Carbon reinforcement of the Nidda bridges, A5/A648 motorways

Frankfurt am Main, Germany

Start of construction: May 2020

Construction volume (value of our services): 2,62 M EUR

Reinforcement of the partial structures 01 + 02 in the course of the A648 motorway over the Nidda using carbon concrete

Heat storage Rostock

Rostock, Germany

Start of construction: February 2020

Construction volume (value of our services): 3,424 M EUR

Between February 2020 and October 2020, Implenia Spezialtiefbau GmbH constructed the pile foundation with pile cap for Stadtwerke Rostock's new heat storage facility. The project is located in Rostock's Schmarl industrial estate in the immediate vicinity of the Warnow river and the Rostock overseas port. The 55 m high heat storage facility has a diameter of 35 m and stands on 151 DU 900 mm large-diameter drilled piles with an average pile length of 37 m.

DB Regio AG – New construction of locomotive workshop hall

Freiburg im Breisgau, Germany

Start of construction: June 2019

Construction volume (value of our services): 4,5 M EUR

Construction of the shell of a workshop hall in solid construction

Constellium pressing plant PL12, production and logistics halls with adjoining social building and workshop

Singen, Germany

Start of construction: March 2019

Construction volume (value of our services): 15,7 M EUR

Turnkey construction of production and logistics halls with adjoining social building and workshop

Mannheim Technical Town Hall

Mannheim, Germany

Start of construction: July 2018

Construction volume (value of our services): 1,557 M EUR

Construction of the excavation pit and driven pile foundation for the new building of the Technical Town Hall in Mannheim.

CarGarantie G10 - New office and administration building

Freiburg, Germany

Start of construction: January 2018

Construction volume (value of our services): 3,5 M EUR

Implenia built the shell of an office and administration building.

Home port Düsseldorf

Düsseldorf, Germany

Start of construction: August 2017

Construction volume (value of our services): 6,99 M EUR

In Düsseldorf's Media Harbour, an excavation pit was constructed for the construction of two approx. 100 m high residential towers with underground parking.

[Translate to English:] Takeda Impfstoffwerk

Takeda vaccine manufacturing facility in Singen

Singen, Germany

Start of construction: January 2017

Construction volume (value of our services): 10,5 M EUR

Takeda W35 + W36 vaccine manufacturing facility in Singen

[Translate to English:] Brücke Kulmbach

Kulmbach Bridge

Untersteinach, Germany

Start of construction: October 2016

Construction volume (value of our services): 1,7 M EUR

New construction of bridge 4-2 on the B 289 over the non-electrified two-track railway line between Bamberg and Hof. This structure is part of the planned Untersteinach bypass (Kulmbach district).

[Translate to English:] Vacher Brücke

Vacher Bridge

Fürth, Germany

Start of construction: October 2016

Construction volume (value of our services): 3 M EUR

Renovation of the Vacher Bridge BW 032 over the Zenn River

[Translate to English:] Instandsetzung BW 1400 Mettnicher Talbrücke BAB 1

Maintenance of BW 1400 Mettnich Viaduct BAB 1

Primstal, Germany

Start of construction: June 2016

Construction volume (value of our services): 702.000 EUR

On behalf of the state office for road construction, maintenance was carried out on the underside of Mettnich Viaduct, which is situated on the A1 motorway between the Nonnweiler - Primstal and Braunshausen junctions.

Marieninsel excavation pit, Frankfurt am Main

Frankfurt am Main, Germany

Start of construction: December 2015

Construction volume (value of our services): 11,61 M EUR

Between November 2015 and November 2016, the joint venture Implenia Spezialtiefbau GmbH / Robert Zeller GmbH & Co.KG constructed the Marieninsel excavation pit. The dewatering was shut down in June 2017. The project is located on the edge of Frankfurt's banking district and comprises the two sub-projects Marienforum and Marienturm. The client of the project is Pecan Development GmbH. The Marienforum is an approximately 40m high, flat-founded building. In addition to office space, the building will house 2 restaurants.

VDE 8.1 Breitengüßbach - Zapfendorf

Breitengüßbach, Germany

Start of construction: October 2015

Construction volume (value of our services): 18,126 M EUR

As part of the German Unity Transport Project No. 8 ( VDE.8 ), Implenia Speialtiefbau GmbH was awarded the contract for the planning and execution of the entire special civil engineering works for the construction section PFA 23/24 in May 2015.

[Translate to English:] Kläranlage Ilmenau

Ilmenau sewage treatment plant

Ilmenau, Germany

Start of construction: August 2015

Construction volume (value of our services): 6,7 M EUR

New replacement for the Ilmenau sewage treatment plant

[Translate to English:] BIPSO

BIPSO "Quality Control Laboratory" production building

Singen, Germany

Start of construction: August 2015

Construction volume (value of our services): 6,8 M EUR

Construction of a quality control laboratory as an extended building shell with subsequent steel structure, waterproofing, façades and interior construction work for the BIPSO production facilities of the pharmaceutical and diagnostics company Bracco