Mannheim Technical Town Hall

Mannheim, Germany

Start of construction: July 2018

Construction volume (value of our services): 1,557 M EUR

Construction of the excavation pit and driven pile foundation for the new building of the Technical Town Hall in Mannheim.

CarGarantie G10 - New office and administration building

Freiburg, Germany

Start of construction: January 2018

Construction volume (value of our services): 3,5 M EUR

Implenia built the shell of an office and administration building.

Home port Düsseldorf

Düsseldorf, Germany

Start of construction: August 2017

Construction volume (value of our services): 6,99 M EUR

In Düsseldorf's Media Harbour, an excavation pit was constructed for the construction of two approx. 100 m high residential towers with underground parking.

[Translate to English:] Takeda Impfstoffwerk

Takeda vaccine manufacturing facility in Singen

Singen, Germany

Start of construction: January 2017

Construction volume (value of our services): 10,5 M EUR

Takeda W35 + W36 vaccine manufacturing facility in Singen

[Translate to English:] Brücke Kulmbach

Kulmbach Bridge

Untersteinach, Germany

Start of construction: October 2016

Construction volume (value of our services): 1,7 M EUR

New construction of bridge 4-2 on the B 289 over the non-electrified two-track railway line between Bamberg and Hof. This structure is part of the planned Untersteinach bypass (Kulmbach district).

[Translate to English:] Vacher Brücke

Vacher Bridge

Fürth, Germany

Start of construction: October 2016

Construction volume (value of our services): 3 M EUR

Renovation of the Vacher Bridge BW 032 over the Zenn River

[Translate to English:] Instandsetzung BW 1400 Mettnicher Talbrücke BAB 1

Maintenance of BW 1400 Mettnich Viaduct BAB 1

Primstal, Germany

Start of construction: June 2016

Construction volume (value of our services): 702.000 EUR

On behalf of the state office for road construction, maintenance was carried out on the underside of Mettnich Viaduct, which is situated on the A1 motorway between the Nonnweiler - Primstal and Braunshausen junctions.

Marieninsel excavation pit, Frankfurt am Main

Frankfurt am Main, Germany

Start of construction: December 2015

Construction volume (value of our services): 11,61 M EUR

Between November 2015 and November 2016, the joint venture Implenia Spezialtiefbau GmbH / Robert Zeller GmbH & Co.KG constructed the Marieninsel excavation pit. The dewatering was shut down in June 2017. The project is located on the edge of Frankfurt's banking district and comprises the two sub-projects Marienforum and Marienturm. The client of the project is Pecan Development GmbH. The Marienforum is an approximately 40m high, flat-founded building. In addition to office space, the building will house 2 restaurants.

VDE 8.1 Breitengüßbach - Zapfendorf

Breitengüßbach, Germany

Start of construction: October 2015

Construction volume (value of our services): 18,126 M EUR

As part of the German Unity Transport Project No. 8 ( VDE.8 ), Implenia Speialtiefbau GmbH was awarded the contract for the planning and execution of the entire special civil engineering works for the construction section PFA 23/24 in May 2015.

[Translate to English:] Kläranlage Ilmenau

Ilmenau sewage treatment plant

Ilmenau, Germany

Start of construction: August 2015

Construction volume (value of our services): 6,7 M EUR

New replacement for the Ilmenau sewage treatment plant

[Translate to English:] BIPSO

BIPSO "Quality Control Laboratory" production building

Singen, Germany

Start of construction: August 2015

Construction volume (value of our services): 6,8 M EUR

Construction of a quality control laboratory as an extended building shell with subsequent steel structure, waterproofing, façades and interior construction work for the BIPSO production facilities of the pharmaceutical and diagnostics company Bracco

[Translate to English:] Lärmschutzwand Ditzingen

Noise barrier in Ditzingen

Ditzingen, Germany

Start of construction: June 2015

Construction volume (value of our services): 540.000 EUR

Construction of a noise barrier in Ditzingen

[Translate to English:] Lärmschutzwand Rastatt-Karlsruhe-Wiesental

Rastatt-Karlsruhe-Wiesental noise barrier

Rastatt-Karlsruhe-Wiesental, Germany

Start of construction: January 2015

Construction volume (value of our services): 4,5 M EUR

Installation of noise barriers along the Rastatt-Karlsruhe-Wiesental railway line

[Translate to English:] Chempark Dormagen

CHEMPARK Dormagen

Cologne, Germany

Start of construction: December 2014

Construction volume (value of our services): 4,7 M EUR

Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer

[Translate to English:] Wärmespeicher Dessau

Heat accumulator, Dessau

Dessau-Roßlau, Germany

Start of construction: November 2014

Construction volume (value of our services): 1,31 M EUR

Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau