Map view

Carbon reinforcement of the Nidda bridges, A5/A648 motorways

Frankfurt am Main, Germany

Start of construction: May 2020

Construction volume (value of our services): 2,62 M EUR

Reinforcement of the partial structures 01 + 02 in the course of the A648 motorway over the Nidda using carbon concrete

Heat storage Rostock

Rostock, Germany

Start of construction: February 2020

Construction volume (value of our services): 3,424 M EUR

Between February 2020 and October 2020, Implenia Spezialtiefbau GmbH constructed the pile foundation with pile cap for Stadtwerke Rostock's new heat storage facility. The project is located in Rostock's Schmarl industrial estate in the immediate vicinity of the Warnow river and the Rostock overseas port. The 55 m high heat storage facility has a diameter of 35 m and stands on 151 DU 900 mm large-diameter drilled piles with an average pile length of 37 m.

Pontoons of Cologny, Geneva

Cologny, Switzerland

Start of construction: September 2019

Construction volume (value of our services): 1,8 M CHF

The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this complex is the central pool opening. Bathers can enjoy the unobstructed view of the Lake Geneva Basin and its world-famous "Jet d'Eau".

DB Regio AG – New construction of locomotive workshop hall

Freiburg im Breisgau, Germany

Start of construction: June 2019

Construction volume (value of our services): 4,5 M EUR

Construction of the shell of a workshop hall in solid construction

South-West Bypass Brugg

Brugg/Windisch/Hausen, Switzerland

Start of construction: April 2019

Construction volume (value of our services): 33 M CHF

The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.

Constellium pressing plant PL12, production and logistics halls with adjoining social building and workshop

Singen, Germany

Start of construction: March 2019

Construction volume (value of our services): 15,7 M EUR

Turnkey construction of production and logistics halls with adjoining social building and workshop

Mannheim Technical Town Hall

Mannheim, Germany

Start of construction: July 2018

Construction volume (value of our services): 1,557 M EUR

Construction of the excavation pit and driven pile foundation for the new building of the Technical Town Hall in Mannheim.

CarGarantie G10 - New office and administration building

Freiburg, Germany

Start of construction: January 2018

Construction volume (value of our services): 3,5 M EUR

Implenia built the shell of an office and administration building.

Panxwiesen groundwater pumping station, Malans

Malans, Switzerland

Start of construction: January 2018

Construction volume (value of our services): 235.000 CHF

A new pumping station was built in the Panxwiesen district in order to increase the drinking water capacity of the municipalities of Malans and Landquart.

Home port Düsseldorf

Düsseldorf, Germany

Start of construction: August 2017

Construction volume (value of our services): 6,99 M EUR

In Düsseldorf's Media Harbour, an excavation pit was constructed for the construction of two approx. 100 m high residential towers with underground parking.

[Translate to English:] Takeda Impfstoffwerk

Takeda vaccine manufacturing facility in Singen

Singen, Germany

Start of construction: January 2017

Construction volume (value of our services): 10,5 M EUR

Takeda W35 + W36 vaccine manufacturing facility in Singen

[Translate to English:] Brücke Kulmbach

Kulmbach Bridge

Untersteinach, Germany

Start of construction: October 2016

Construction volume (value of our services): 1,7 M EUR

New construction of bridge 4-2 on the B 289 over the non-electrified two-track railway line between Bamberg and Hof. This structure is part of the planned Untersteinach bypass (Kulmbach district).

[Translate to English:] Vacher Brücke

Vacher Bridge

Fürth, Germany

Start of construction: October 2016

Construction volume (value of our services): 3 M EUR

Renovation of the Vacher Bridge BW 032 over the Zenn River

Construction of new swimming pool and sports hall on Sursee campus

Oberkirch, Switzerland

Start of construction: October 2016

Construction volume (value of our services): 43,7 M CHF

Construction of new swimming pool and sports hall on Sursee campus

Basel, Roche Construction 02 (Roche Tower 2)

Basel, Switzerland

Start of construction: October 2016

Construction volume (value of our services): 20 M CHF

The joint venture for Roche Construction 02, consisting of the Foundation Engineering business unit of Implenia Switzerland Ltd. and BAUER Schweiz AG, was instructed by Hofmann – La Roche in 2016 to construct the excavation pit and the foundations for what will eventually be the tallest building in Switzerland, measuring in at 205 metres high. With a 75% share of the total order volume, Implenia took responsibility for technical direction of the joint venture.