Map view
Filter: Germany
Results: 256

Renovation of two raw meal silos at the Karsdorf cement plant

Karsdorf, Germany

Start of construction: September 2020

Construction volume (value of our services): 3,413 M EUR

Implenia is renovating two 70-metre-high raw meal silos at the Karsdorf cement plant in Saxony-Anhalt on behalf of OPTERRA Zement GmbH.

Underground car park Luitpoldplatz Bayreuth

Bayreuth, Germany

Start of construction: September 2020

Renovation of the underground car park.

Subway access structure Oberhafentunnel

Hamburg, Germany

Start of construction: August 2020

Construction volume (value of our services): 12,5 M EUR

Construction of a new subway access structure with connection to the station HafenCity University

Bridge reinforcement with carbon concrete at Kleinsaubernitz

Kleinsaubernitz, Germany

Start of construction: August 2020

Construction volume (value of our services): 128.000 EUR

As part of a pilot project, Implenia reinforced a road bridge with carbon concrete.

New LPME research building TU Kaiserslautern

Kaiserslautern, Germany

Start of construction: June 2020

Construction volume (value of our services): 4,58 M EUR

Construction of the LPME (Laboratory for Ultra-Precision and Micro-Engineering) research building of the Technical University of Kaiserslautern

Fraport Terminal 3,1. BA

Frankfurt, Germany

Start of construction: June 2020

Construction volume (value of our services): 10,75 M EUR

In the Rhine-Main metropolitan region, the new Terminal 3 is being built at Frankfurt Airport Fraport, with high-quality metal and glass facades from Implenia Fassadentechnik.

Construction LasmAaZ - Nuclear power plant Krümmel

Geesthacht, Germany

Start of construction: June 2020

Construction volume (value of our services): 21,2 M EUR

Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.

Stadtbahn line U81, lot 2, shell construction of tunnel

Düsseldorf, Germany

Start of construction: May 2020

Construction volume (value of our services): 23 M EUR

Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction.

Stadtbahn line U81 in Düsseldorf, shell construction for elevated route

Düsseldorf, Germany

Start of construction: May 2020

Construction volume (value of our services): 22 M EUR

Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated foundation work and the construction of an arched steel bridge using the incremental launching method.

Further construction of the groundwater basin Ohu

Essenbach, Germany

Start of construction: April 2020

Construction volume (value of our services): 56 M EUR

Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).

Wohnhochhaus Berlin Gropiusstadt

Berlin, Germany

Start of construction: January 2020

Construction volume (value of our services): 24,5 M EUR

Implenia is building a residential high-rise building with 151 in Berlin's Gropiusstadt Rental apartments for the regular customer degewo.

Klosterwall Hamburg

Hamburg, Germany

Start of construction: January 2020

New construction of a quarter in the "Kontorhausviertel".

New office building DSTRCT, Berlin

Berlin, Germany

Start of construction: December 2019

Construction volume (value of our services): 11 M EUR

Implenia Fassadentechnik can announce another major order with the DSTRCT project in Berlin. The new building in Berlin-Pankow, designed by architects Gewers & Pudewill, will be given a modern aluminium-glass façade by Implenia with a total value of over 11 million euros.

TAMI V

Ratingen, Germany

Start of construction: August 2019

Construction volume (value of our services): 14 M EUR

Sustainable office quarter with lots of greenery all around - Implenia is building the TAMI V office building in the Schwarzbach quarter in Ratingen.

380-kV-Kabeldiagonale, 50hertz

Berlin, Germany

Start of construction: August 2019

Construction volume (value of our services): 128 M EUR

Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts