Map view

Internal renewal, Hummelbergstrasse 8 - 16

Rapperswil-Jona, Switzerland

Start of construction: February 2020

Construction volume (value of our services): 4,7 M CHF

The existing properties are located in an attractive residential area in Rapperswil-Jona and were renovated a few years ago. Although the occupancy rate remains very good, the owner has been intending to carry out a renovation for several years. In addition, the owner and the administration have requested numerous options, which means that the renovation costs have not met the criteria of economic viability.

Refresh of “TORO 1” commercial building, Brown Boveristrasse 5

Zürich, Switzerland

Start of construction: August 2019

Construction volume (value of our services): 20 M CHF

The current main tenants have reduced their rental space. The vacant rental area measuring around 8,900 m², about 45% of the total rental area, is to be made available for rental to various users (multi-tenant) in future.

New building of the Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: June 2019

Construction volume (value of our services): 47,6 M CHF

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

SBB four-track expansion – Liestal

Liestal, Switzerland

Start of construction: June 2019

Construction volume (value of our services): 114,7 M CHF

Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure.

Spitallamm dam – Grimsel

Grimsel, Switzerland

Start of construction: May 2019

Construction volume (value of our services): 98 M CHF

The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.

Zuidelijke Ringweg, Groningen

Groningen, Netherlands

Start of construction: January 2019

The southern bypass of the Dutch city of Groningen is about twelve kilometers long. The contract for the expansion of the southern ring road was awarded to the consortium Combinatie Herepoort.

Enclosure construction in Schwamendingen (Zurich) – noise protection measures

Zurich, Switzerland

Start of construction: September 2018

Construction volume (value of our services): 53,055 M CHF

Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.

RBS Section 1.2 Postparc – expansion of Bern train station

Bern, Switzerland

Start of construction: August 2018

Construction volume (value of our services): 13,7 M CHF

Sub-project involving the expansion of Bern train station

Winterthur Town Village

Town Village, Winterthur, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 2,2 M CHF

A multi-use, multi-faceted development with a community focus.

Cantonal Hospital St.Gallen KSSG -Eastern switzerland Children's Hospital OKS

St. Gallen, Switzerland

Start of construction: March 2018

Construction volume (value of our services): 68 M CHF

Generation project in brief

N01/42, 46 UPlaNS junction Zurich East – Effretikon

Wallisellen, Switzerland

Start of construction: February 2018

Construction volume (value of our services): 78,88 M CHF

Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.

[Translate to English:] Pieterlen Bassbelt, Biel

Pieterlen Bassbelt

Biel/Bienne, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 1,81 M CHF

Spring 2019 saw the completion of the new, timber-clad Bassbelt superstructure between Bassbeltweg and Solothurnerstrasse in Pieterlen.

[Translate to English:] Quai Zürich

Quai Zurich

Zurich, Switzerland

Start of construction: April 2017

The Quai Zurich project involves the redevelopment of the global headquarters of the Zurich Insurance Group. Bringing together heritage properties full of tradition and state-of-the-art construction, the project reflects the evolving nature of our company.

Sinergia

Chur, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 69 M CHF

Office building with open-plan layout. Merging of 14 departments.

[Translate to English:] Giessenturm - Aussenansicht

Giessenturm (specialist planning)

Dübendorf, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 90 M CHF

In the north west of Dübendorf, between the rural road and the idyllic path along the bank of the River Glatt, a new urban district is being built in five stages on the former Givaudan site, with completion scheduled for 2022.