Varberg Tunneln FAS 2

Vårberg, Sweden

Start of construction: December 2018

Construction volume (value of our services): 328 M EUR

The project comprises the two-lane extension of the Varberg-Hamra section, which is part of the Västkustbanan railway line connecting Göteborg with the southern Swedish city of Lund. As part of an Early Contractor Involvement contract (ECI con-tract), Implenia was initially awarded with the Preliminary Design (Phase 1) in June 2018, and subsequently with the Detailed Design and Construction (Phase 2) in September 2019.

Citylink Anneberg-Skanstull Tunnel

Stockholm, Sweden

Start of construction: December 2018

Construction volume (value of our services): 90 M EUR

As the second of four phases of the so-called City Link Project, the Anneberg-Skanstull Tunnel serves to improve the power supply in the Greater Stockholm area. At a length of around 14 km and a diameter of 5 m, the tunnel is being driven about 50 - 100 m below the Swedish capital using a tunnel boring machine.

Slussen SN91

Stockholm, Sweden

Start of construction: January 2018

Construction volume (value of our services): 77 M EUR

Extensive rock and concrete work at Katarina Mountain

Rönnskär - Repository

Skellefteå, Sweden

Start of construction: January 2018

Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock excavation chambers with high crack protection, located around 330 m below sea level below the smelter. The contract is the first won by Implenia Sverige AB for the mining industry. The project has a duration of 3 years, starting in January 2018.

Getingmidjan

Stockholm, Sweden

Start of construction: April 2017

Construction volume (value of our services): 88 M EUR

Complex project in the heart of Stockholm.

Marieholm Tunnel

Göteborg, Sweden

Start of construction: March 2017

To ease the traffic situation in Gothenburg, Sweden, the new Marieholmstunnel was built. It is intended to facilitate the crossing of the Göta Älv river, which runs through the city center, and to reduce congestion at the neighboring Tingstadtunnel and the existing bridges.

E4 Förbifart, Johannelund tunnel

Vällingby, Sweden

Start of construction: December 2014

Construction volume (value of our services): 254 M EUR

The bypass “Förbifart” Stockholm is a link between the north and south of the capital of Sweden and intends to relieve the traffic through the city. The 21 km long bypass motorway, of which approximately 17 km are underground in a depth of up to 70 m, is divided into six lots. With the 3.6 km long Johannelund tunnel (Lot FSE 403), Implenia won the contract for one of the first lots.

Spillepengen transport hub

Malmö, Sweden

Start of construction: September 2014

The 370 meter long bridge was concreted in three sections and post-tensioned by BBV Systems with internal tendons BBV L9 and BBV L19.

Lysekil LNG tank

Lysekil, Sweden

Start of construction: April 2012

In Lysekil on the west coast of Sweden, approx. 60 km north of Gothenburg, the currently largest LNG (Liquefied Natural Gas) receiving terminal in Scandinavia was built on behalf of Skangass.

Arsta Bridge

Stockholm, Sweden

Start of construction: May 2011

The “Citybanan” project in the heart of Stockholm includes several tunnel construction projects (including the Söderström tunnel, which was pre-tensioned by BBV), as well as bridge structures over busy train routes and motorways.

Söderström tunnel

Stockholm, Sweden

Start of construction: September 2009

The Söderström tunnel as part of the Citybanan project is an approx. 300 meter long submerged tunnel that crosses under the Söderström and a branch of Lake Mälaren and is located between two rock tunnels.

Citybanan Project Odenplan and Vasatunnel

Stockholm, Sweden

Start of construction: December 2008

Construction volume (value of our services): 147 M EUR

The Citybanan connects the northern and the southern part of Stockholm subterranean with two additional rail tracks and doubles the capacity of the rail connection which exists since 1871. The wider area of Stockholm increases by 20.000 inhabitants every year. To offset the estimated traffic volume, the project Citybanan was realized.

Northern Links 12 and 22

Stockholm, Sweden

Start of construction: December 2007

Construction volume (value of our services): 165 M EUR

The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.

Botniabanan

Kramfors and Umea, Sweden

Start of construction: October 2007

The bridges were longitudinally prestressed with BBV tendons of various sizes.

East Side Combined Sewer Overflow ESCSO

Portland, United States

Start of construction: May 2005

Construction volume (value of our services): 349 M EUR

As the largest of all Portland’s projects to reduce overflows into the Willamette River, the East Side Combined Sewer Overflow tunnel is designed to significantly reduce sewage and storm water overflows. To reduce risk exposure on the project the JV was awarded during the pre-design phase with a “Phase 1 pre-construction contract”. Within a 9 month period the JV optimized the design in collaboration with the client and its designer.