SMS 2A - New double track railway Sandbukta-Moss-Såstad

Såstad, Dilling, Moss, Norway

Start of construction: June 2019

Construction volume (value of our services): 728 M CHF

The new double track railway Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and is one of the sections of the line towards Halden (the Østfold railway's western line).

Storöy wind farm

Storöy, Norway

Start of construction: January 2018

The Storöy wind farm is located on the north side of the island of Storøya in the province of Rogaland near the city of Haugesund in Norway.

Saggrenda Bridge, Norway

Saggrenda, Norway

Start of construction: May 2017

A section of the E134 includes the approx. 300 m long Saggrenda Bridge, which spans 10 fields and rests on a 78 m long and 21 m high concrete arch over the Kobberbergselva river.

E18 Knapstad-Retvet, Norway

Knapstad, Norway

Start of construction: April 2015

Tendons for a section of the E18 between Knapstad and Retvet

EK2: Farris bridge

Larvik, Norway

Start of construction: September 2014

Construction volume (value of our services): 2,26 M EUR

Farris bridge pases in a horizontal curve around the Farris Lake, near Larvik in Vestfold. The bridge is a part of E18, and is a part of the new 7 km long stretch from Bommestad to Sky in Larvik. The bridge is a part of the new E18 in Vestfold, Norway.

Eiganestunnelen, E 39 (Lot E04)

Stavanger, Norway

Start of construction: January 2014

Construction volume (value of our services): 249 M EUR

The E39 Eiganes tunnel (Lot E04) is part of the coastal main road between Kristiansand and Trondheim and is built in conjunction with rv.13 Ryfast which connects the municipal districts of Strand and Stavanger. This urban road tunnel project will relieve the area from traffic, improve road safety and reduce road congestion.

Tresfjord Bridge

Vestnes, Norway

Start of construction: January 2013

The Tresfjord Bridge with a length of 1,290 meters is part of the approximately 20 km long extension of the E 136 motorway between Åndalsnes and Ålesund.

East Side Combined Sewer Overflow ESCSO

Portland, United States

Start of construction: May 2005

Construction volume (value of our services): 349 M EUR

As the largest of all Portland’s projects to reduce overflows into the Willamette River, the East Side Combined Sewer Overflow tunnel is designed to significantly reduce sewage and storm water overflows. To reduce risk exposure on the project the JV was awarded during the pre-design phase with a “Phase 1 pre-construction contract”. Within a 9 month period the JV optimized the design in collaboration with the client and its designer.

Litjsund Bridge

Nähe Trondheim, Norway

Start of construction: April 2005

As part of the Imarsund project, a new road connection was built on the coast of Norway, west of Trondheim.