Bassbelt residential complex

Pieterlen, Switzerland

Start of construction: January 2017

Construction volume (value of our services): 23,3 M CHF

New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved walkways, a playground and carports (36 cars).

Haus Adeline Favre (Hall 52)

Winterthur, Switzerland

Start of construction: December 2016

Construction volume (value of our services): 69 M CHF

In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new construction of replacement property.

Construction of new swimming pool and sports hall on Sursee campus

Oberkirch, Switzerland

Start of construction: October 2016

Construction volume (value of our services): 43,7 M CHF

Construction of new swimming pool and sports hall on Sursee campus

Basel, Roche Construction 02 (Roche Tower 2)

Basel, Switzerland

Start of construction: October 2016

Construction volume (value of our services): 20 M CHF

The joint venture for Roche Construction 02, consisting of the Foundation Engineering business unit of Implenia Switzerland Ltd. and BAUER Schweiz AG, was instructed by Hofmann – La Roche in 2016 to construct the excavation pit and the foundations for what will eventually be the tallest building in Switzerland, measuring in at 205 metres high. With a 75% share of the total order volume, Implenia took responsibility for technical direction of the joint venture.

Am Glattbogen

Zurich, Switzerland

Start of construction: July 2016

Construction volume (value of our services): 82 M CHF

Replacement construction at "Am Glattbogen" with 229 rental apartments, commercial zones and childcare facilities.

[Translate to English:] Schulpavillon Steinmürli, Dietikon

Construction of a new school pavilion in Steinmürli

Dietikon, Switzerland

Start of construction: May 2016

Construction volume (value of our services): 2 M CHF

Six classrooms and nursery rooms for a total of 110 children, provided for the start of the 2017/2018 school year.

Andreasturm

Zurich, Switzerland

Start of construction: April 2016

Construction volume (value of our services): 100 M CHF

SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main tracks in the north-eastern section of the train station and the Amstein-Walthert building.

Biogen BMC, civil works & structural steel

Luterbach, Switzerland

Start of construction: January 2016

Realization of the project "Next Generation Manufacturing" of Biogen in Luterbach.

Construction of the new Rotweg school building

Wädenswil, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 850.000 CHF

In parts four stories high, the project is situated atop a public parking garage.

Cable Gallery

Lausanne, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 11,5 M CHF

As part of the preparatory work for the Lausanne train station construction site, all the cables managing the region's rail activity had to be diverted. To do this, we have excavated and sealed two wells 27.00 and 22.00 deep, for the introduction of a micro tunnel machine with an external radius of 3.00 m, which will has drilled a 625 m long tunnel under the Lausanne train station. We also built 2 covered trenches to connect the existing networks to the cable gallery.

[Translate to English:] Schulhaus Oberfeld - Aussenansicht

Oberfeld school building

Root, Switzerland

Start of construction: December 2015

Construction volume (value of our services): 12 M CHF

Between 2016 and 2018, the premises were extended with the addition of a new school wing including a nursery, a daycare facility, a staff room and a classroom.

[Translate to English:] Neubausiedlung sue&til - Aussenansicht

sue&til (building services)

Winterthur, Switzerland

Start of construction: November 2015

Construction volume (value of our services): 18 M CHF

In the "Neuhegi" district of Oberwinterthur, more than 300 new apartments for rental and ownership are being built using wooden construction methods. The ground floor will also contain public areas filled with commercial spaces.

Pont Rouge Lot B1

Lancy, Switzerland

Start of construction: August 2015

Construction volume (value of our services): 12,5 M CHF

Construction of a complex for SBB Real Estate consisting of three towers of 13 to 15 floors (total area of 47'365 m2 of offices and shops) but also an underground parking of 353 places on 3 levels of basements over the entire surface of the plot.

New construction of the retirement and nursing home Humanitas Niederholz

Riehen, Switzerland

Start of construction: August 2015

Construction volume (value of our services): 4,15 M CHF

Retirement and nursing home on 3 upper floors.

Ceres Tower

Pratteln, Switzerland

Start of construction: August 2015

Construction volume (value of our services): 8,5 M CHF

The high-rise building is a mixed use of office and residential