COOP Rolle

Rolle, Switzerland

Start of construction: October 2018

Construction volume (value of our services): 7 M CHF

Construction of multifunctional buildings in the center of Rolle (Vaud).

Servicebuilding Preola

Zürich, Switzerland

Start of construction: September 2018

Construction volume (value of our services): 11,9 M CHF

In Zurich Altstetten, "West-Log" is a property for city logistics.

Total renovation Sommerhaldenstrasse 13+15

Brugg, Switzerland

Start of construction: May 2018

Construction volume (value of our services): 12,8 M CHF

The properties, which comprise 102 flats, have never been completely renovated since they were constructed in 1981 and 1984.

Office and commercial building Orion

Zürich, Switzerland

Start of construction: May 2018

Construction volume (value of our services): 20 M CHF

Office and commercial building Orion, 8005 Zurich

WÜB WolkenWerk

Oerlikon, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 30 M CHF

Implenia is constructing the three high-rise residential buildings and associated plinth structures in the up-and-coming Zurich-Oerlikon district.

Modernisation of the metering infrastructure and upgrade to individual room control

Hünenberg See, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 140.000 CHF

For the ownership of the first construction phase of the Chämleten residential building in Hünenberg See, Tetrag replaced the meters in 93 apartments due to component discontinuation. It also retrofitted individual room control in order to improve comfort and energy efficiency.

Leonardo - Thurgauerstrasse 80

Zürich, Switzerland

Start of construction: April 2018

Construction volume (value of our services): 19,784 M CHF

The "Leonardo" office building, which went into operation in 2002, was at the time the largest office building in Switzerland to be built to the Minergie standard.

Grubenstrasse 23 / 25

Langenthal, Switzerland

Start of construction: January 2018

Construction volume (value of our services): 1,7 M CHF

Prior to the actual building works, Implenia Real Estate Consulting carried out a property analysis to investigate the development potential of the property. After completion of the analysis, a renovation concept was developed including a colour scheme up to and including obtaining building permission.

Renovation of the Weyergut Centre, Mohnstrasse 4

Köniz, Switzerland

Start of construction: January 2018

The "Weyergut" retirement and nursing home in Wabern, which originally served as a retirement home and is currently used as a nursing home with its own dementia unit, is in need of renovation after 40 years of intensive use.

Panxwiesen groundwater pumping station, Malans

Malans, Switzerland

Start of construction: January 2018

Construction volume (value of our services): 235.000 CHF

A new pumping station was built in the Panxwiesen district in order to increase the drinking water capacity of the municipalities of Malans and Landquart.

Overbuilding Rebgarten, Liestal

Liestal, Switzerland

Start of construction: November 2017

Construction volume (value of our services): 6,8 M CHF

Residential and commercial building, divided into two continuous basement levels with three structures on top.

[Translate to English:] Zürich Flughafen SwissLounge

SwissLounge at the airport

Zurich airport, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 350.000 CHF

Implenia Holzbau helped produce and install the new SwissLounge at the Zürich Airport with a close partnership between our wood construction and our finish carpentry teams.

Vogelsang Wetzikon – Mönchberg- /Preyen- /Tösstalstrasse

Wetzikon, Switzerland

Start of construction: October 2017

Construction volume (value of our services): 62 M CHF

The modernisation of the area comprises three stages with 12 existing residential buildings. The majority of the properties are Göhner buildings which are being enlarged to meet contemporary living requirements, including the addition of a new storey.

Renovation Überlandstrasse 375/377 und 391/393

Zürich, Switzerland

Start of construction: August 2017

Construction volume (value of our services): 20 M CHF

The two apartment buildings from the 1960s with a total of 180 apartments are in great need of renovation and refurbishment.

Interior renovation Postmatte 1/3/5 and Zellburg 2/3/4

Schenkon, Switzerland

Start of construction: March 2017

Construction volume (value of our services): 6,4 M CHF

The scope of the renovation of these six residential buildings with a total of 68 flats comprised the bathroom units, kitchens, lift systems and parts of the external works. In addition, contaminants were removed from the areas requiring renovation.