Neues Technisches Rathaus, Mannheim

Short description

Perfect for technical masterpieces: The new Technical Town Hall in the Glückstein Quarter is located in the south of the Baden-Württemberg city of Mannheim, in the Rhine-Neckar metropolitan region. Implenia Formwork Construction played a leading role in the construction of the building.

The project

The New Technical Town Hall has a rectangular ground plan with external dimensions of approx. 75m x 75m. The structure rising from the underground car park is divided into a U-shaped low-rise building with a maximum of 6 storeys and a high-rise section with 14 storeys.
The building complex has an underground floor which is embedded approx. 4.0m into the building ground and was founded with a base area of approx. 90m x 60m beyond the outer edges of the building. Glückstein-Quartier

Services in detail

  •  Drawing up insert and joinery plans
  • Preparation of simple static calculations / verifications
  • Logistics (delivery and removal) 
  • Manufacture of special formwork (special deck tables)

Scarf systems:

  •    Trio panel formwork for single- and double-sided wall formwork
  •    SB1 and SB2 brace frames as support construction for single-sided wall formwork
  •    Column formwork for rectangular cross-sections (PAX HD60) and circular cross-sections (SRS column formwork)
  •    VT table modules (standard and special slab tables as edge slab tables)
  •    Skydeck modular slab formwork (drophead system)
  •    TG60 load towers (Layher) as shoring for high slab areas and beams  

Challenges

  • Planning of shoring for high slab and joist areas and cantilevered special deck tables, taking into account the applicable work safety guidelines.  
  • Planning of high reinforced concrete walls h= approx. 8.00m with already mounted steel girders for later cantilevered beams.
  • Coordination of approx. 80 outward and approx. 80 return transports each.

Interest aroused? Get in touch with us!

Contact

Back to overview