Watch video

New construction "WolkenWerk" Zurich

In the three high-rise buildings and basement floors of the "WolkenWerk" in Zurich, more than 300 condominiums have been created with a demand for high living quality and sustainability.

Holistically conceived new buildings

New construction


New construction competence in practice

A building becomes good from the ground up when it is designed and implemented holistically


Design models

You have the choice between different models


Your contacts

We look forward to talking to you about forward-looking new buildings and sophisticated modernisations.

Jens Vollmar
Head Division Buildings & Country President Schweiz

 

 

+41 58 474 06 10 jens.vollmar@implenia.com Linkedin Download VCF-Card Business card
Stefan Winkler, MRICS
Head of Real Estate Consulting and Clients / Head of Region Central
+41 58 474 34 62 stefan.winkler@implenia.com Linkedin Download VCF-Card Business card
Roman Müller
Head of Master Builder German-speaking Switzerland
+41 58 474 04 54 roman.mueller@implenia.com Linkedin Download VCF-Card Business card
Marc Brülhart
Head Northwest Region
marc.bruelhart@implenia.com Linkedin Download VCF-Card Business card
Raffaele Balmelli
Head of Region Central / East, Branch Manager Lugano & Chur a.i.
+41 58 474 10 95 raffaele.balmelli@implenia.com Linkedin Download VCF-Card Business card
Danila Aimone
Head Region West
+41 58 474 05 16 danila.aimone@implenia.com Linkedin Download VCF-Card Business card
Thomas Rolli
Leiter Region Zürich
Division Buildings
thomas.rolli@implenia.com Linkedin Download VCF-Card Business card
Philippe Laurent Kaufmann
Head of Modernisation Switzerland
+41 58 474 27 50 philippelaurent.kaufmann@implenia.com Download VCF-Card Business card
Eric Burg
Head of Modernisation and Branch Manager Onex
eric.burg@implenia.com Linkedin Download VCF-Card Business card

Our locations

14 locations Sort by:
asc desc

Contact

Would you like advice on the subject of execution models?

* mandatory fields

Our new building references

Neubau Wohnen im Knonau

Knonau, Switzerland

Start of construction: March 2015

Residential development with 3 MFH with 5 apartments each and 5 EFH.

Neubau Wohnheime Rathausen SSBL

Emmen, Switzerland

Start of construction: March 2015

New construction 3 dormitories with 90 resident rooms.

GIBZ Bildungszentrum Trakt 5

Zug, Switzerland

Start of construction: April 2016

Educational center with 20 classrooms, 10 group rooms and 1 seminar room.

Neubau Wohnüberbauung Feldbreite Baufeld D2

Emmen, Switzerland

Start of construction: September 2014

Residential development with 151 apartments and commercial space on the ground floor, underground parking with 131 parking spaces.

Neubau Halle 7, Militärflugplatz ZLE

Emmen, Switzerland

Start of construction: July 2018

Hangar building with a total of 7 aircraft boxes in solid construction 187mx27m. On the north side is a three-story annex for offices.

Laborprovisorium Functional Genomics Center Zürich

Zürich, Switzerland

Start of construction: July 2021

The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…

COE Green Village, Bâtiment Kyoto

Le Grand-Saconnex, Switzerland

Start of construction: June 2022

Construction of an administrative building in the new Green Village district on the site of the Ecumenical Center of Churches.

Neubau Alterspflegeheim Humanitas

Riehen, Switzerland

Start of construction: September 2015

A new building is planned for a nursing home for the elderly with a garden in Riehen, Niederholz. The building has a basement, a ground floor and three upper floors.

MFH Lilienstrasse

Allschwil, Switzerland

Start of construction: July 2020

The "Lilienstrasse" project consists of a four-storey building and a car park.

Schoren Hochhäuser

Basel, Switzerland

Start of construction: July 2014

The construction project comprises the new construction of two high-rise buildings with 18 and 16 upper floors respectively. Both buildings have two basement floors. The existing car park was structurally repaired and adapted to…