Onex, Implenia Switzerland Ltd.
In Onex, our customers have access to Implenia's entire service portfolio. Our specialists work across the board, regardless of location or division, to offer you the best solution from a single source.
SERVICES OFFERED TO CUSTOMERS
Contact
References
CHEMPARK Dormagen
Cologne, Germany
Start of construction: December 2014
Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer
Bocksbachtal Bridge
Karlsbad, Germany
Start of construction: July 2011
Construction of the new Bocksbachtal Bridge and a rainwater retention basin
N01/42, 46 UPlaNS Verzweigung ZH Ost – Effretikon
Wallisellen, Switzerland
Start of construction: February 2018
Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.
Staumauer Spitallamm – Grimsel
Grimsel, Switzerland
Start of construction: May 2019
The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.
RBS Los 1.2 Postparc – Ausbau Bahnhof Bern
Bern, Switzerland
Start of construction: August 2018
Sub-project involving the expansion of Bern train station
Kabel Galerie
Lausanne, Switzerland
Start of construction: January 2016
As part of the preparatory work for the Lausanne train station construction site, all the cables managing the region's rail activity had to be diverted. To do this, we have excavated and sealed two wells 27.00 and 22.00 deep, for…
Pont Rouge Lot B1
Lancy, Switzerland
Start of construction: August 2015
Construction of a complex for SBB Real Estate consisting of three towers of 13 to 15 floors (total area of 47'365 m2 of offices and shops) but also an underground parking of 353 places on 3 levels of basements over the entire…
Wehrhahn line, lot 1
City of Düsseldorf, Germany
Start of construction: December 2006
In order to improve the local public transportation system, the state capital of Duesseldorf has made the decision to expand the so-called core section of the Wehrhahn Line as an underground city railway line, replacing 5…
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction: October 2016
Construction of new swimming pool and sports hall on Sursee campus
Hochhaus Park Tower
Zug, Switzerland
Start of construction: January 2012
Park Tower high-rise building
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed