Bourget du Lac, Implenia France SA
À Le Bourget du Lac, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Contact
References
Kvarnholmsförbindelsen
Stockholm, Sweden
Kvarnholmen is an island in the Stockholm Archipelago that was used industrially. The former industrial area has now been developed into a vibrant urban environment.
Getingmidjan
Stockholm, Sweden
Start of construction: April 2017
Complex project in the heart of Stockholm.
Line B of the Lyon Metro
Lyon, France
Start of construction: January 2018
This project, with a length of approximately 2.5 km, will extend line B from Gare d'Oullins station to Hôpitaux Lyon Sud station and create two additional stations. The journey time between Oullins station and the Lyon Sud…
Rönnskär - Endlager
Skellefteå, Sweden
Start of construction: January 2018
Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock…
Slussen SN91
Stockholm, Sweden
Start of construction: January 2018
Extensive rock and concrete work at Katarina Mountain
Citylink Anneberg-Skanstull Tunnel
Stockholm, Sweden
Start of construction: December 2018
As the second of four phases of the so-called City Link Project, the Anneberg-Skanstull Tunnel serves to improve the power supply in the Greater Stockholm area. At a length of around 14 km and a diameter of 5 m, the tunnel is…
SGP – Ligne 15 sud, Lot T2C
Noisy-Champs, France
Start of construction: December 2015
The Grand Paris Express project aims to better connect the French capital and neighbouring residential areas in the Paris region by building a six-line driverless metro system by 2030. The project will require 210 kilometres of…
Galerie de sécurité du tunnel du Fréjus
Fréjus, France
Start of construction: January 2009
Following the fire of the Mont Blanc Tunnel in 1999, substantial changes were made to the regulations which resulted in the Fréjus Tunnel being brought into compliance. The Société Française du Tunnel Routier du Fréjus (SFTRF)…
CERN - Galerie UA 53
Cessy, France
Start of construction: November 2019
All for science: CERN, the European Organisation for Nuclear Research (Conseil Européen pour la Recherche Nucléaire), is one of the largest and most renowned centres for basic physics research in the world.
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
Address
Bourget du Lac, France
Implenia France SA
Savoie Technolac Parc Ouragan – Bat A, 20 rue du Lac Majeur
73370 Bourget du Lac