Satigny, Switzerland
Implenia Schweiz AG
À Satigny, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Service offerts
References
SGP – Ligne 15 sud, Lot T2C
Noisy-Champs, France
Start of construction:
December 2015
Construction volume (value of our services):
403,707 M CHF
Costs converted according to average yearly exchange rates during project realization
The Grand Paris Express project aims to better connect the French capital and neighbouring residential areas in the Paris region by building a six-line driverless metro system by 2030. The project will require 210 kilometres of…
Galerie de sécurité du tunnel du Fréjus
Fréjus, France
Start of construction:
January 2009
Construction volume (value of our services):
166,521 M CHF
Costs converted according to average yearly exchange rates during project realization
Following the fire of the Mont Blanc Tunnel in 1999, substantial changes were made to the regulations which resulted in the Fréjus Tunnel being brought into compliance. The Société Française du Tunnel Routier du Fréjus (SFTRF)…
Noise protection tunnel A7 Hamburg-Altona
Hamburg, Germany
Start of construction:
April 2021
Construction volume (value of our services):
202,24 M CHF
Construction of a noise protection tunnel on the A7 motorway in Hamburg-Altona
Renovation of two raw meal silos at the Karsdorf cement plant
Karsdorf, Germany
Start of construction:
September 2020
Construction volume (value of our services):
3,67 M CHF
Costs converted according to average yearly exchange rates during project realization
Implenia is renovating two 70-metre-high raw meal silos at the Karsdorf cement plant in Saxony-Anhalt on behalf of OPTERRA Zement GmbH.
Farrisbrua (E 18 Larvik Norwegen, Länge: 570 Meter)
Larvik, Norway
Start of construction:
October 2014
Construction volume (value of our services):
2,526 M CHF
Costs converted according to average yearly exchange rates during project realization
Farris bridge pases in a horizontal curve around the Farris Lake, near Larvik in Vestfold. The bridge is a part of E18, and is a part of the new 7 km long stretch from Bommestad to Sky in Larvik. The bridge is a part of the new…
Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS
St. Gallen, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
68 M CHF
The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…
Pontoons of Cologny, Geneva
Cologny, Switzerland
Start of construction:
September 2019
Construction volume (value of our services):
1,8 M CHF
The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…
Construction LasmAaZ - Nuclear power plant Krümmel
Geesthacht, Germany
Start of construction:
June 2020
Construction volume (value of our services):
22,426 M CHF
Costs converted according to average yearly exchange rates during project realization
Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.
Stadtbahn line U81 in Düsseldorf, shell construction for elevated route
Düsseldorf, Germany
Start of construction:
May 2020
Construction volume (value of our services):
23,295 M CHF
Costs converted according to average yearly exchange rates during project realization
Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated…
Stadtbahn line U81, lot 2, shell construction of tunnel
Düsseldorf, Germany
Start of construction:
May 2020
Construction volume (value of our services):
24,354 M CHF
Costs converted according to average yearly exchange rates during project realization
Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction. …
Contact
Address
Satigny, Switzerland
Implenia Schweiz AG
Route du Bois-de-Bay 67
1242 Satigny