Marin-Epagnier, Implenia Switzerland Ltd.
À Marin-Epagnier, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts
REAL ESTATE CONSULTING & PLANNING
Contact
References
New building of the Cantonal Hospital Aarau “Dreiklang”
Aarau, Switzerland
Start of construction: January 2020
The Cantonal Hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…
Bassbelt residential complex
Pieterlen, Switzerland
Start of construction: January 2017
New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…
Südwestumfahrung Brugg
Brugg/Windisch/Hausen, Switzerland
Start of construction: April 2019
The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.
TELT, CO08 - Villard Clément
Lyon, France
Start of construction: January 2021
Construction of the base tunnel from the Villard Clément portal attacks.
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Kvarnholmsförbindelsen
Stockholm, Sweden
Kvarnholmen is an island in the Stockholm Archipelago that was used industrially. The former industrial area has now been developed into a vibrant urban environment.
Getingmidjan
Stockholm, Sweden
Start of construction: April 2017
Complex project in the heart of Stockholm.
Line B of the Lyon Metro
Lyon, France
Start of construction: January 2018
This project, with a length of approximately 2.5 km, will extend line B from Gare d'Oullins station to Hôpitaux Lyon Sud station and create two additional stations. The journey time between Oullins station and the Lyon Sud…
Rönnskär - Endlager
Skellefteå, Sweden
Start of construction: January 2018
Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock…
Slussen SN91
Stockholm, Sweden
Start of construction: January 2018
Extensive rock and concrete work at Katarina Mountain
Address
Marin-Epagnier, Switzerland
Implenia Switzerland Ltd.
Champs-Montants 10A
2074 Marin-Epagnier