
Luzern, Implenia Switzerland Ltd.
In Luzern können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
Division Civil Engineering - Ingenieurbau Schweiz Baueinheit LU / ZG (Hauptstandort)
References
Heat accumulator, Dessau
Dessau-Roßlau, Germany
Start of construction: November 2014
Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau
Metro Subway Nuremberg U3, BA 2.1
Nuremberg, Germany
Start of construction: July 2014
In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west…
Niederfinow ship lift
Niederfinow, Germany
Start of construction: May 2008
Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal.
Ilmenau sewage treatment plant
Ilmenau, Germany
Start of construction: August 2015
New replacement for the Ilmenau sewage treatment plant
Elevated water tank in Bamberg
Bamberg, Germany
Start of construction: April 2014
An elevated container with a usable capacity of 10,000 cubic metres was constructed above Bamberg old town in order to ensure a continuous supply of drinking water.
Mannheim power station
Mannheim, Germany
Start of construction: May 2009
Construction of a coal-fired power station unit to ensure the long-term security of electricity and district heating generation
Gollachbrücken
Gollhofen, Germany
Start of construction: April 2017
New replacements for three bridges as part of the bridge strengthening scheme for the Gollach Bridge
CHEMPARK Dormagen
Cologne, Germany
Start of construction: December 2014
Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer
Bocksbachtal Bridge
Karlsbad, Germany
Start of construction: July 2011
Construction of the new Bocksbachtal Bridge and a rainwater retention basin
N01/42, 46 UPlaNS junction Zurich East – Effretikon
Wallisellen, Switzerland
Start of construction: February 2018
Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.
Address
Luzern, Switzerland
Implenia Switzerland Ltd.
Obergütschrain 2
6003 Luzern
Opening hours
07:30
-
12:00
13:15
-
17:00
Closed