Luzern, Implenia Switzerland Ltd.
In Luzern können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
Division Civil Engineering - Ingenieurbau Schweiz Baueinheit LU / ZG (Hauptstandort)
References
Renewal of the Schwarzach bridge BAB A9
Feucht, Germany
Start of construction: October 2021
Part of the measure is the demolition and renewal of the motorway bridge incl. 2 distributor lanes and the rehabilitation of the structure drainage of the entire extension area.
Südwestumfahrung Brugg
Brugg/Windisch/Hausen, Switzerland
Start of construction: April 2019
The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.
TELT, CO08 - Villard Clément
Lyon, France
Start of construction: January 2021
Construction of the base tunnel from the Villard Clément portal attacks.
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Kvarnholmsförbindelsen
Stockholm, Sweden
Kvarnholmen is an island in the Stockholm Archipelago that was used industrially. The former industrial area has now been developed into a vibrant urban environment.
Getingmidjan
Stockholm, Sweden
Start of construction: April 2017
Complex project in the heart of Stockholm.
Line B of the Lyon Metro
Lyon, France
Start of construction: January 2018
This project, with a length of approximately 2.5 km, will extend line B from Gare d'Oullins station to Hôpitaux Lyon Sud station and create two additional stations. The journey time between Oullins station and the Lyon Sud…
Rönnskär - Endlager
Skellefteå, Sweden
Start of construction: January 2018
Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock…
Slussen SN91
Stockholm, Sweden
Start of construction: January 2018
Extensive rock and concrete work at Katarina Mountain
New LPME research building TU Kaiserslautern
Kaiserslautern, Germany
Start of construction: June 2020
Construction of the LPME (Laboratory for Ultra-Precision and Micro-Engineering) research building of the Technical University of Kaiserslautern